Laserfiche WebLink
onal Use Permit <br />sion. Preliminary <br />e 7-1 <br />uncil meeting <br />rom applicant <br />ng Commission <br />plan adopting <br />sive hardcover <br />r’s report will <br />:eipt of <br />nittal of <br />awn. <br />n, please <br />'mission Minutes <br />ipon review <br />II <br />Ut <br />1 <br />■ V <br />,1 <br />t <br />iV <br />■'1 <br />mm <br />i-. <br />mK-j <br />r^' <br />V.-.'. <br />MIIMIMEHAHA CREEK <br />WATERSHED DISTRICT <br />P.O. Box 387, Wayzata, Minnesota 55391 <br />UKC MINNITONKA <br />■OARD OF MANAGERS: <br />David H. Cochran, Praa. • Albert L. Lehman • John C. Thomas • Barbara R. Godmundion • Michael R. Carroll <br />July 29, 1983 <br />o* ^e <br />Ms. Jeanne A. Mabusth <br />City Administrator <br />City of Orono <br />PU Box 66 <br />Crystal Bay, Minnesota 55323 <br />13 ilf.; • <br />AUG-21963 <br />Re: 764 - Calvary Memorial Church <br />766 - McDonald's Corporation <br />767 - Sid Rebers - Subdivision <br />CITY OF ORONO <br />Dear Ms. Mabusth: <br />In response to your request regarding comments of the above mentioned <br />applications. The District staff has reviewed these plans and offer the <br />following comments. <br />764 - Calvary Memorial Church - Variance unconditional use. <br />The calucations submitted with your information package appear to be <br />consistent with past Board requirements for the management of stormwater <br />runoff. However, to adequately review the application, the District will <br />require a Final Site Grading and Drainage Plan. This plan shall include <br />both existing and proposed contour elevations and a detail of ^ outlet <br />structure for the proposed stormwater retention pon?T <br />766 - McDonald's Corporation - Corxlitional use permit. <br />In order to adequately review this proposal, the applicant shall submit a <br />Final Site Grading and Drainage Plan. This plan shall include provisions <br />to provide retention and water quality for stonnwater runoff. The <br />existing site includes a 24 inch KCP located on the southeast quadrant. <br />The applicant shal 1 . include hydrogeologic calculations to support the <br />Final Grading and Drainage Plan, and ensure the District that the rate of <br />runoff through this 24 inch RCP shall not increase as a result of the <br />development . <br />-Vr <br />jSoH€dh04 <br />2335 W. <br />Si, Ptd, Afii»aU <br />pUm»> 6f2‘636- <br />f’SOi <br />August <br />City o <br />Box 66 <br />Crysta <br />Attn: <br />Re: Fi <br />Dear J <br />We hav <br />Memori <br />tional <br />The dr <br />storag <br />sign d <br />not Im <br />runoff <br />If the <br />mend a <br />the ad <br />develo <br />effect <br />the pr <br />Glenn <br />GRC:11 <br />6257b