My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-1983 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1983 Planning Packets
>
09-19-1983 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 1:51:16 PM
Creation date
12/7/2022 3:29:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
View images
View plain text
ture <br />j house. <br />Lcate <br />sites <br />19 house. <br />i how <br />based <br />Lve system <br />jciflc <br />>pear <br />Mm <br />TO; <br />FROM; <br />DATE ; <br />SUBJECT; <br />Planning Commission Members <br />Jeanne A. Mabusth, Zoning Administrator <br />September 13, 1983 <br />#761 - Douglas Smith - 3237 Casco Circle -Variance <br />^Ppl^eation rescheduled befr>T*<a m • « . <br />of the applicant. * Planning Commission at the request <br />Application - Variance - Lot Area - Lot Width <br />Lot Area <br />Required <br />Required <br />Existing <br />Variance <br />Variance <br />21,780 sq. <br />17,424 sq. <br />16,748 sq. <br />5,032 sq. <br />676 sq. <br />Lot Width <br />Required - <br />Required - <br />Existing - <br />Variance - <br />Variance - <br />ft. (100% Required) <br />ft. (80% Required) <br />ft. or 77% <br />ft. or 23% (100% required) <br />ft. or 3.9% (80% required) <br />100* (100% Required) <br />80* (80% Required) <br />55* <br />45* or 45% (100% Required) <br />25 or 31% (80% Required) <br />List of Exhibif-fi <br />Exhibit <br />Exhibit <br />Exhibit <br />Exhibit <br />Exhibit <br />Exhibit <br />Exhibit <br />Exhibit <br />Exhibit <br />A - Lot Width & Lot Area Study <br />c ' letter - July 19, 1983 <br />J- Smith letter - August 2, 1983 <br />- Brouchle letter - August 25, 1983 <br />P ” Administrator's letter - August 29 iQfii <br />F - zoning Administrator's letter - August 30 ills <br />H : SihTn with smith Application 'T Survey dated June 1, 1973 <br />Planning Commission minutes - July 18, 1983 <br />(presennannpnt)nattorny^annthnz°"^®"'^t/i*’®*'''®®" Property ovmers secretary called to Isk tSat Administrator. nJ. smith's <br />Planning Commission agenda. i assSL TolT^t^ntabling. <br />» - - -^ JL, <br />it on^tnconcn.^®"® on the application and send <br />#761 - Do <br />September <br />Page 2 <br />What is t <br />structure <br />line betwi <br />a lot lin( <br />bring the. <br />propertiei <br />of surroui <br />property 1 <br />If it is <br />tion is n <br />your cour <br />adequate . <br />the LR-1( <br />applicati< <br />of this v< <br />a) the sp< <br />are pe* <br />b) the coj <br />the dij <br />c) the grc <br />and en’ <br />the grc <br />health, <br />to the <br />that th <br />conveni <br />demonSt <br />And direct <br />width varia <br />study is CO] <br />If Planning <br />information <br />following f. <br />1. <br />2. <br />3. <br />4. <br />No avaiJ <br />Sewer ar <br />House ar <br />additior <br />Applicar <br />on devel
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).