Laserfiche WebLink
2?: <br />• ^^oOosJn <br />IMSo^ <br />JUN3OB03 ?• <br />JUfiFORONO <br />*•. ^ —• <br />— <br />f ^4,-^ <br />4/ <br />i-‘l <br />■-; • ■■>■ <br />m. <br />'• -M <br />'. ■--■></•. .'I• -.li* . <br />.H <br />i r-. <br />I <br />x„' . <br />■T,-Kiiiiii. <br />"•'?i <br />Sps^i <br />........................................• ^ <br />iPw«- <br />■?;ii <br />Department of NaUiral Resources 6MCAR § 1.5023 <br />(3) The harbor shall be available for use by the general public. <br />(4) The development plans shall minimize the watcrw.nrd en­ <br />croachment of the facilities. <br />e. Off-shore marinas: <br />(1) The area shall be zoned for such use or local governnrent <br />shall grant a land use permit. <br />(2) The proposed marina shall minimize encroachment water- <br />ward of the ordinary high water mark. <br />(3) The marina shall be sized consistent with the demand for <br />mooring facilities in the area and the number of watercraft to be served. <br />E. Retaining walls. <br />1. General standards: A permit shall be required for the constmetion <br />or reconstruction of all retaining walls which should be discouraged because <br />their appearance is generally not consistent with the natural environ nent and <br />their construction and maintenance cost is generally greater than riprap. <br />2. Permit: Tire issuance of permits shall be contingent on all of the fol­ <br />lowing conditions: <br />a. Existing or expected erosion problems shall preclude the use of <br />riprap shore protection, or there shall be a demonstrated need for direct <br />shorcland docking. <br />b. Design shall be consistent with existing uses in the arc.'r. Example.^ <br />are: riverfront commcrcial/industrial areas having existing structures of this <br />nature, dense residential shorcland areas where similar retaining wrdls arc <br />common, resorts where floating docks may be attached to such a bulkhead, <br />or where barges arc utilized to transport equipment and supplies. <br />c. Adequate engineering studies shall be performed of foundation <br />conditions, ticbacks, internal drainage, construction materials, and protection <br />against flanking. <br />d. Tlie facility shall not be an aesthetic intrusion upon the area and <br />is consistent with all applicable local, state, and federal management plans <br />and programs for the water body. <br />c. Encroachment below the orduiary high water mark shall be held <br />to the absolute minimum necessary for construction. <br />F. Other waterway obstructions. A permit shall be required for the con­ <br />struction, reconstruction, relocation, removal, and abandonment of all other <br />off-shore structures, cables other than utility crossings, pilings, or other fa­ <br />cilities not covered by specific regulations: <br />E <br />Bii <br />m.2 <br />t. > <br />sr-- <br />if-' <br />Vi.''■ * <br />i <br />r I <br />|« i! <br />W <br />,-A- <br />DNR-8 <br />PHONE: <br />Jur <br />RE; <br />Dea <br />Sint