Laserfiche WebLink
ORONO HARDCOVER CALCULATION WORKSHEET <br />LAKESHORE <br />SETBACK <br />ZONE <br />A. Existing <br />lot area <br />in zone <br />B. Existing <br />liardcover <br />in zone <br />C. Existing <br />hardcover <br />percentage <br />( (B-rA) X 100) <br />D. Proposed <br />hardcover <br />in zone <br />E. Proposed p <br />hardcover <br />percentage <br />( (DfA) X 100) <br />Allowed <br />hardcover <br />percentage <br />0-75’V50O s£sf %■73 ♦ 1 1* - xo <br />0 <br />75-250'”7 7 oo sf sf r'.ir.cU sf ‘1 'V %25 % <br />250-500'sf sf sf <br />' ■) <br />Yo 30 <br />500-1000 'sf sf %sf %35 % <br />i <br />Directions: <br />A. Existing Lot Area in Zcne - includes the total square footage of dry buildable land <br />within the specified zone. <br />B. Existing Hardcover in Zone - includes the square footage of existing roofs, decks, sidewalks, <br />driveways (gravel or paved) and oth“r rain-imperviouti surfaces within the specified zo.ne. <br />C. Existing Hardcover Percentage - divide the nutnbcr in B by the number in A and multiply by 100. <br />D. Proposed Hardcover in Zone - includes the existing hardcover plus all proposed additional <br />hardcover. - - - <br />E <br />F <br />Proposed Hardcover Percentages - divide the number in D by the number in A and multiply by 100. <br />Allowed Hardcover Percentages - if the percentages in column E for any setback zone exceed <br />the allowed percentages in column F, you should contact the Zoning Department at 473-7357 <br />to discuss the possibilities of obtaining a variance. Generally, if a concurrent removal <br />of existing hardcover matches the additional liardcover proposed, resulting in no net increase <br />of hardcover in a specified zone, a variiinco may not be necessary.