Laserfiche WebLink
• HI ■ mmfi^ <br />^ -T-/^ 7 P C/ ! ' '"' ■' •■■'■''■ <br />ORONO HARDCOVER CALCULATION WORKSHEET <br />LAKESHORE <br />SETBACK <br />ZONE <br />A. Existing <br />lot area <br />in zone <br />B. Existing <br />hardcover <br />in zone <br />C. Existing <br />hardcover <br />percentage <br />[ (B-IA) X 100] <br />D. Proposed <br />hardcover <br />in zone <br />E. Proposed <br />hardcover <br />percentage <br />( (D^A) X 100) <br />F. Allowed <br />hardcover <br />percentage <br />0-75’/ f sf /.9 %V sf v 0 Vc <br />75-250'1 c.%sf 3 3.7 sf 25 Vo <br />250-500'sf <br />/ <br />sf /O sf 30 _ _ _ <br />500-1000 •sf sf sf %35 % 1 <br />Directions; <br />A, <br />B <br />C <br />D <br />E <br />F <br />Existing Lot A ea in Zone - includes the total st^.-are footage of dry buildable land <br />within the specified zone. <br />Existing Hardcover in Zone - includes the square footage of existing roofs, decks, sidewalks, <br />driveways (gravel or paved) and other rain-impervious surfaces within the specified zone. <br />Existing Hardcover Percentage - divide the number in B by the number in A and multiply by 100. <br />Proposed Hardcover in Zone - includes the existing hardcover plus all proposed additional <br />hardcover. - - - <br />Proposed Hardcover Percentages - divide tlie number in D by the number in A and multiply by 100. <br />Allowed Hardcover Percentages — if t)ic percentages in column E for any setback zone exceed <br />the allowed percentages in column F, you should contact the Zoning Depart.ment at 473-7357 <br />to discuss the possibilities of obtaining a variance. Generally, if a concurrent removal <br />of existing hardcover matches t)ie additional hardcover proposed, resulting in no net increase <br />of hardcover in a'specified zone, a variance may not be necessary.