Laserfiche WebLink
i <br />! • <br />} 1 <br />2. The silt fence should be inspected irequently by <br />your staff to ensuLe its integrity. The fence <br />must be functioning properly during the dredging <br />operation to prevent heavy silt loads to Brown's <br />Bay. <br />3. The outlet of the wildlife pond should have a <br />baffle or shimmer to remove debris prior to <br />discharge to Brown's Bay. <br />4. The property owner should be encouraged to avoid <br />the use of fertilizers, herbicides, and pesticides <br />in areas adjacent to the two ponds. <br />^ I have discussed these comments and recommendations <br />with Mr. Greg Kopischke of Westwood Planning and Engineering <br />Company, If you have any questions or require additional <br />information, please let me know. <br />Sincerely, <br />doel C. Settles <br />District Limnologioc <br />JS:sj <br />cc: Mr. Greg Kopischke