Laserfiche WebLink
'iWii'i-v <br />ORONO HARDCOVER CALCULATION WORKSHEET <br />•/- <br />L.AKESHORE <br />SETBACK <br />ZONE <br />A. Existing <br />lot area <br />in zone <br />B. Existing <br />hardcover <br />in zone <br />C. Existing <br />liardcover <br />percentage <br />1(BtA) X 100) <br />D. Pioposed <br />liardcover <br />in zone <br />E. Proposed <br />hardcover <br />percentage <br />1(DfA) X 100] <br />F. Allowed <br />hardcover <br />percentage <br />013 sf - ^ ^ o y <br />— /o sf/ , i s j- <br />A-\ <br />yo 0 Vc <br />75-250'7-A'SOs£sf t /r.sf -> 1 . ’25 Vo <br />250-500•sf sf Y sf 30 © / <br />/ <br />500-1000'sf sf Yy o sf %35 Vo <br />Directions; <br />A,Existing Lot Area in Zone - includes the total square footage of dry buildable land <br />within the specified zone. <br />Existing Hardcover in Zone - includes the square footage of existing roofs, decks, sidewalks, <br />driveways (gravel cr paved) and other rain-impervious surfaces within the specified zone. <br />E.xisting Hardcover Percentage - divide the nundaer in B by the number in A and multiply by 100. <br />Proposed Hardcover in Zone - includes the existing hardcover plus all proposed additional <br />hardcover. - - - <br />Proposed Hardcover Percentages - divide the number in D by the nu.mber in A i.nd miuitiply by 100. <br />Allowed Hardcover Percentages - if the percentages in column E for any setback zone exceed <br />the allowed percentages in colu.mn F, you should contact the Zoning Department ar 473-7357 <br />to discuss the possibilities of obtaining a variance. Generally, if a concurrent re.moval <br />of existing hardcover rotchos the additional Jiardcover proposed, resulting in no not increase <br />of hardcover in a specified zone, a variance may not be necessary. <br />toiT Iftirti