Laserfiche WebLink
R 7 <br />and- <br />of <br />ease <br />One <br />lems <br />51, <br />next <br />mend <br />the <br />losed <br />lore- <br />the <br />MINUTES OF THE PLANNING COMMISSION MEETING HELD DECEMBER 16, 1985. PAGE 8 <br />#989 HENNEPIN COUNTY DEPARTMENT OF TRANSPORTATION <br />1. Pentachloropheno1 treated timbers to be used in <br />construction. <br />2. Granular fill can only be used for backfill - <br />dredged material to be moved from site. <br />3. A geotextile filter fabric to be used behind the <br />metal seawall. <br />Motion, Ayes 5, Nays 1. <br />McDonald opposed the motion because she would like to request <br />that at least one light be located at the ramp for the <br />health, safety and welfare of all citizens. She added that <br />there is new subdued lighting available from NSP. <br />#992 CITY OF ORONO <br />COUNTY ROAD 15 AND SPATES AVENUE <br />CONDITIONAL USE PERMIT AND VARIANCE <br />CONTINUATION OF PUBLIC HEARING 7:51-8:02 PM <br />Zoning Administrator Mabusth noted the affidavit of publica­ <br />tion and certificate of mailing. <br />Chairman Callahan explained that this application involves <br />the access next to Paul's Landing at the end of Spates <br />Avenue. The City is seeking to make the access safer by <br />filling and raising the grade to the County Road. <br />Zoning Administrator Mabusth clarified that the proposed <br />slope will be a slightly steeper slope than the existing, <br />however, it will be more graduated with adequate stopping <br />area at the top. <br />Assistant Zoning Administrator Gaffron stated that the LP <br />tanks located at Paul's Landing will be removed as soon as <br />Paul's Landing has ceased to be in operation (December 1985). <br />It was moved by Goetten, seconded by McDonald, to recommend <br />approval of the City of Orono's application for a conditional <br />use permit and variance to permit filling and grading within <br />75 feet of the lakeshore based on the following findings: <br />1. Improvem.ent will result in greater safety for users <br />of lake access. <br />2. Improvement will facilitate access off lake. <br />Conditions of approval: <br />1. Staff to work with marina operator to remove all <br />obstacles deemed obstructions to sighting, specifically <br />the LP tank. <br />2. City to use all necessary erosion control measures <br />prior to and after improvement.