Laserfiche WebLink
hhk -wT*’' ^•SUOTC^':- <br />I <br />i <br />i <br />in4 <br />M <br />KEN ROELOFS CONSTRUCTION INC. <br />1650SHADYWOOD ROAD / WAYZATA.MN55391 / PHONE: 471*8390 <br />PROJECT SUMMARY <br />for <br />Jim and JoAnn Nor <br />2S0S Dunwoody Avenue <br />Wayzata, MN 55391 <br />O ci <br />r-W /S^’4 <br />The design problem In this project Is to eliminate confusion and <br />Improve the sense of arrival for the Nordlle home. Two doors In the <br />same elevation, with two large concrete stairways provide the public <br />face for the home. The design solution Is an addition within the <br />existing footprint of the building providing a single entry that will <br />serve both family and guests. The addition provides for much-needed <br />foyer space and entry closet storage. The primary entry area Is <br />approximately 24 laches lower than the existing main floor to lessen <br />the massive concrete stairway while maintaining the existing roof <br />j_ine. Some sidewalk revision will be made to accommodate the new <br />entry. Unnecessary pavers and concrete will be removed yielding as <br />much green area as is possible. <br />This request is for an increase In the hard cover allowance in the <br />75» _ 250' zone. Although the addition has about 320 sq. ft. of floor <br />space and 100 sq. ft. of concr-te step, existing hard cover in the <br />area of the addition and proposec' sidewalk revisions yield a net <br />Increase of hard cover In the amount of approximately 105 sq. ft. <br />Based upon survey data, this would Increase the hard cover in the zone <br />from the existing 8328 sq. ft. (38.07*/.) to 8457 sq. ft. (38.55%). <br />We would further request that this matter be considered at the <br />earliest possible date by both the Planning Commission and the City <br />Council. Contracts and Specifications were drawn and work was <br />proposed to begin on or about A,il 1, 1990 without the knowledge that <br />this process needed to be workfcu through. Several specaal oj.der Items <br />are in process and will need to be warehoused at some expense as this <br />process unfolds. Timely consideration and action that would grant a <br />start date one or two weeks earlier would be a great help. Mr. and <br />Mrs. Nordlle and our firm are ready to do whatever we can to this end. <br />Thank you for your consideration on behalf of Mr. and Mrs. Nordlle. <br />Sincerely, <br />Gerald L. Roelofs <br />KEN ROELOFS CONSTRUCTION, INC. <br />GLR/mr <br />I <br />VI <br />r* <br />9 <br />9 <br />J1