My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-18-1990 Planning Packet
Orono
>
Planning Commission
>
1990
>
06-18-1990 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:48:28 AM
Creation date
12/1/2022 9:41:03 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To; Mayor Grabek & Orono Council Members <br />Planning Commission Chairman Kelley <br />Orono Planning Commission Members <br />City Administrator Bernhardson <br />Pro«; Jeanne A. Mabusth, Building ft Zoning Administrator <br />Dates June 14, 1990 <br />Subject: #1547 Metropolitan Waste Control Commission (MWCC), <br />Intersections of West Fr.rndale Road ft County Road 15 - <br />Conditional Use Permit - Public Hearing <br />Zoning District - LR-IA <br />Pertinent Ordinance - .. , , tSection 10.23, Subdivision 4 (A) - Conditional use permit <br />required for construction of an underground vault to house <br />sewage meter installed on existing sewage force main. <br />List of Exhibits <br />Exhibit A - Application <br />Exhibit B - Property Owners List <br />Exhibit C - Plat Map <br />Exhibit D - Cook's Report dtd 6/13/90 <br />Exhibit E - Certificate of Survey <br />Exhibit F - Hennepin County DOT Permit <br />Exhibit G - Site Plan, Profile, Plan ft Sections <br />Review of Application - <br />The MWCC proposes the installation of a meter station within <br />the County Road right-of-way and property owned by the Nature <br />Conservancy at the intersections of West Ferndale Road and County <br />Road 15. The meter station itself will be underground with a <br />control panel installed above existing grade. The City <br />Engineer's report advises that the control panel is the <br />control panel that was used at the Orono Lift Station. The <br />control panel is 6' in height, 2' in width and 6 long. Cook s <br />repo*t also suggests the need for landscape screenino for the <br />control panel. It would be staff's recommendation that if land <br />scaping is to be considered, that special care be given to the <br />type of landscaping so as to not create any sighting problems at <br />the intersection of Ferndale and the County Road. <br />The MWCC is obtaining both temporary and permanent easements <br />from the Nature Conservancy, for the meter station. In reviewing <br />Exhibits F and G, it would appear that a small section of tne <br />eastbound right-hand lane will be temporarily removed during <br />construction. The eastbound lane will continue to function <br />through the construction, and as Cook's <br />will not Involve any restriction with the use of Ferndale Road.
The URL can be used to link to this page
Your browser does not support the video tag.