My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-19-1990 Planning Packet
Orono
>
Planning Commission
>
1990
>
03-19-1990 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:38:01 AM
Creation date
12/1/2022 9:33:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1506 <br />March 12, 1990 <br />Page 3 of 3 <br />Options of Action - <br />Denial. If members choose to deny the subdivision <br />application as proposed, please refer to the necessary findings <br />in Section 11.02, Subdivision 10 (A). <br />Approval. The following findings and conditions may be <br />considered if the Planning Commission recommends approval of the <br />2-lot subdivision. <br />The proposed 2-lot subdivision of Carol Senn is approved <br />finding that all standards of the RR-lB rural residential zoning <br />district. Subdivision Regulations and On-site Septic standards <br />have been satisfied. The subdivision approval is subject to the <br />following conditions: <br />1. Dedication of 33' of Watertown Road. <br />2. Owner of Lot 2 to grant temporary driveway easement over <br />Outlet A in favor of Lot 1. The City Engineer has reviewed <br />the location of the shared access at Watertown Road and <br />finds the sighting distance for a 40 MPH roadway to be <br />satisfactory. <br />3. Outlet A has been created for shared driveway purposes <br />and shall be legally combined with Lot 2. <br />4. The future owner of Lot 1 has hereby been granted <br />temporary access via a private driveway through a road <br />outlet and at the time a future west access corridor is <br />installed at the north border, legal access must be provided <br />from the north. <br />5. Payment of a park dedication fee for newly created Lot <br />1 at $200.00 per lot. <br />6. Prior to final plat approval, applicant shall provide <br />engineering plans for private driveway. P <br />include erosion control and design for wood plank bridge.
The URL can be used to link to this page
Your browser does not support the video tag.