My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-20-1990 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1990
>
08-20-1990 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:25:58 AM
Creation date
12/1/2022 9:19:28 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1573 <br />August 15r 1990 <br />Page 4 <br />Approval is subject to the following conditions; <br />1. <br />2. <br />3. <br />4. <br />5. <br />Isv <br />Upon application for a building permit for new construction <br />on Lot 2, the future owner shall pay the following sewer and <br />water fees; <br />Sewer Unit Charge of $1,513.86 <br />Water Unit Charge of $1,691.78 <br />It should also be noted that this rate is based on the 1990 <br />fee schedule and will be adjusted based on the inflationary <br />rate in the 1991 fee schedule. <br />Prior to scheduling the application before the Council, <br />applicant's surveyor to provide an amended survey <br />designating the following; <br />a.Realign lot lines between Lots 1 and 2 so that there is <br />a confirmation that a 1/2 acre dry contiguous envelope <br />exists west of the proposed drainageway within Lot 2. <br />b.Based on required lot line changes applicant's surveyor <br />to provide amendev hardcover facts for Lots 1 and 3. <br />This may be an optional condition and not based on requests <br />of ordinances but does Planning ConMiiission recommend that <br />the lot lines be adjusted so that there is a 100' width at <br />the north edge of the defined building envelope -- or to <br />average lakeshore setback line as depicted on Staff Sketch. <br />Future owner of Lot 2 is hereby advised that hardcover <br />within the 75-250' setback area is to be limited to 25%. <br />Future dock to serve the newly created riparian Lot 2, shall <br />meet the pertinent LMCD standards that determine the allowed <br />boat density units at the dock based on 75-85' of lineal <br />footage of shoreline.
The URL can be used to link to this page
Your browser does not support the video tag.