My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-1900 Planning Packet
Orono
>
Planning Commission
>
1990
>
04-16-1900 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:17:41 AM
Creation date
12/1/2022 9:11:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NEIL D. HEIKKILA & ASSOCIATES, LTD. <br />ATTORNEYS AT LAW <br />NCIL D. HEIKKILA <br />or COUNICL <br />RONALD J. JOHNSON <br />NORWCSr BANK BUILOINQ <br />10 11 SOUTH FIRST STREET • SUITE 430 <br />HOPKINS. MINNESOTA SS343 <br />(612)935-2265 <br />MAILING ADDRESS <br />P O.BOX 5445 <br />HOPKINS. MINNESOTA <br />April 12, 1990 <br />City of Orono <br />ATTENTION: Planning Commission <br />and City Council <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />APR 1 e <br />RE:Adgenda Item 1502, Michael Hilbelink Request <br />For Approvals and Variances to Construct a New <br />Residence at 2180 Prospect Avenue <br />Dear Planning Commission and City Council Members: <br />I am writing to you on behalf of my clients, Alex J. and Dianne F. <br />Jentilucci, who live at 1295 Briar Street. Their home abutts the <br />2180 Prospect Avenue (Hilbelink) property. As my clients, and their <br />neighbors, Bob and Janet Johnson, have indicated previously, they <br />have substantial concerns regarding the proposed building plan for <br />the property. My clients object to the granting of the variance as <br />now requested. <br />Key concerns include the following: <br />(a) Mr. Hilbelink proposes to place the structure on a <br />location other than the site of the former residence. As evidenced <br />by the property address (2170 Prospect Avenue), the former residence <br />was situated toward the back of the lot and closer to Prospect <br />Avenue. The proposed placement of the new residence would result in <br />the structure being closer to the Jentilucci lot line and Briar <br />Street, and in effect becoming a Briar Street residence as opposed <br />to a Prospect Avenue residence. The new structure, which is <br />substantially larger than the old residence, is proposed to be built <br />in an area which had been lower in the past but was filled at the <br />time work was being done on the Crystal Bay sewer project. ur <br />concern is that placement of the structure will result in even more <br />fill and run off toward tha Jentilucci property. <br />(b) As Mr. and Mrs. Jentilucci and Mr. and Mrs. Johnson note <br />in their letter of March 19, 1990, to you, the existing drainage <br />ditch was not sufficient to avoid the Jentilucci and Johnson homes <br />being threatened by flood waters. We fear that the proposed <br />construction and the landscaping which will be necessitated, will <br />result in even more drainage of water toward the Jentilucci lot line <br />and the existing drainage ditch. <br />(c) As you may be aware, the existing drainage ditch is within <br />the Jentilucci property. No easement has been taken by the City of
The URL can be used to link to this page
Your browser does not support the video tag.