My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-1900 Planning Packet
Orono
>
Planning Commission
>
1990
>
04-16-1900 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:17:41 AM
Creation date
12/1/2022 9:11:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1518 <br />April 12, 1990 <br />Page 2 of 5 <br />F) Additional requirements: <br />1. smoke detectors for bedroom area; <br />2. each cabin supplied with approved fire <br />extinguisher labeled for Class A, B and C hazards <br />and minimum extinguisher size shall be lAlOBC. <br />List of Exhibits <br />Exhibit A <br />Exhibit B <br />Exhibit C <br />Exhibit D <br />Exhibit E <br />Exhibit P <br />Exhibit G <br />Exhibit H <br />Exhibit I - <br />Exhibit J <br />Exhibit K <br />Exhibit L <br />Exhibit M <br />Exhibit N <br />Exhibit 0 <br />Exhibit P <br />Exhibit Q <br />Exhibit R <br />- Application <br />- Property Owners List <br />- Plat Map <br />- Before/After Hardcover Fact Sheets <br />- List of Board of Governors 1990 <br />- Map/Site Plan Big Island <br />- Renovation/Reconstruction Plan Revised 2/28/90 <br />“ Copies of 1989-1990 State License to Operate <br />Camp Grounds <br />Resolution #2613 Conditional Use Permit for <br />Overnight Camping <br />Site Plan - Southeast Area - Cabin Site Plan <br />Board of Govenors - Financial Statement <br />Elevations - Optional Cabin Designs <br />Cabin A - Detail Elevations <br />Typical Floor Plan - Cabin A <br />Alternate Floor Plan - Cabin A <br />North Medical Transporation Services - <br />1990 Update Letter <br />Liability Insurance 1990 Season <br />Campground Emergency Preparedness Plan <br />Review of Current Level of Operation and Inproveaents - <br />The existing drainfields within the southeast area and <br />peanut row in the northeast areaare satisfactory, the picnic <br />''^i'thin picnic dock area has been completed and per <br />staff s recent inspections, the septic system is near completion <br />to serve the bathroom area within the picnic shelter structure. <br />The camp proceeded with the 1989 season at a medium successful <br />level. The septic systems appeared to serve visitors to camp. <br />There are apparently no problems with existing septic systems as <br />reported by Inspection staff during last season.
The URL can be used to link to this page
Your browser does not support the video tag.