My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-1990 Planning Packet
Orono
>
Planning Commission
>
1990
>
01-16-1990 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:05:55 AM
Creation date
12/1/2022 8:57:42 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HENNEPIN <br />DEPARTMENT OF PUBLIC WORKS <br />Engineering Division <br />320 Washington Ave. South /' <br />Hopkins, Minnesota 55343-8468 <br />Phone:(612)935-3381 <br />November 30, 1909 <br />Mr. Michael Gaffron <br />Asst. Planning & Zoning Administrator <br />City of Orono <br />P. 0. Box 66 <br />Crystal Bay, MN 55323 <br />Dear Mr. Gaffron: <br />RE: Proposed Plat - Bayside Ridge <br />CSAH 04, South side, approximately 200 west of CSAH 135 <br />Section 6, Township 117, Range 23 <br />Hennepin County Plat No. 1796 <br />Review and Recommendations <br />Minnesota Statutes 505.02 ana 505.03, Plats and Surveys, require County review of <br />proposed plats abutting County roads. We reviewed the above plat and make the <br />following comments: <br />- For future Improvements to CSAH 04 the developer should dedicate an additional 7 <br />feet of right of way making the right of way 40 feet from the center of CSAH 04. <br />- No location along the CSAH 04 frontage of Lot 2 meets the minimum sight distance <br />for the posted speed limit, and therefore, Hennepin County supports using <br />outlets to provide access to Lots 2, 3, and 4 via existing Bayside Ridge Road. <br />The existing access from Lot 1 will be the only direct access to CSAH 04 <br />permitted from this plat. Any revision to an existing access requires an <br />approved Hennepin County entrance permit before beginning any construction. <br />Contact our Operations Division for entrance permit forms. <br />- All proposed construction within County right of way requires an approved <br />utility permit prior to beginning construction. This includes, but Is not <br />limited to, drainage and utility construction, trail development, and <br />landscaping. Contact our Operations Division for utility permit forms. <br />- The developer must restore all areas disturbed during construction within Countv <br />right of way. ' <br />Please direct any response or questions to Les Weigelt. <br />Oavid W. Schmidt, P.E. <br />Transportation Planning <br />0WS/L0W:1w HENNEPIN COUNTY <br />an equal opporlunity employer
The URL can be used to link to this page
Your browser does not support the video tag.