Laserfiche WebLink
PERMIT PROJECT <br />FILE #: 19-000893 <br />3685 TOGO RD WAYZATA MN 55391 <br />BATHROOM REMODEL <br /> <br />INSPECTION INFORMATION <br />Department <br />Community Development <br />Inspection Type <br />Plumbing - Rough In <br />  <br />Assign To <br />Permit #: <br />P19-000146 Bathroom remodel  <br />Created On <br />09/23/2019 by Anne Hentges <br />Notes <br />DATES <br />Date <br />09/25/2019 <br />  <br /> <br />From <br />10: 00  AM <br />To <br />10: 30  AM <br />Completion Date <br />09/25/2019 <br />Status <br />Correct Work & Proceed <br />#STATUS COMMENTS <br /> <br /> <br /> <br /> <br /> INSPECTION COMMENTS  <br />0 Correct ABS to PVC connections At stack in attic and toilet Waste. <br />Jason R. <br />0 Complete Provide nail plates. <br />0 Complete Continue 2 inch stack through roof. <br />0 Visual for bathroom remodel. Vent thru roof, ABS sch 40 to cast iron thru roof connected with mission band. <br />Nail plates provided per correction. <br />1. Correct ABS to PVC back to ABS connection for toilet waste. Allowed only one transition,(ie. ABS to PVC <br />and continue with PVC, cannot convert back to ABS with glued tting). Can use mission bands at transition <br />ttings. <br />OK to cover walls, call for reinspection on toilet waste. Jim H. <br />