My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ltr re authority for minor access maintenance
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
220 Big Island - PID: 23-117-23-23-0028
>
Correspondence
>
Ltr re authority for minor access maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:12:38 PM
Creation date
9/21/2015 1:51:15 PM
Metadata
Fields
Template:
x Address Old
House Number
220
Street Name
Big Island
Address
220 Big Island
Document Type
Correspondence
PIN
2311723230028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
David Lovelace <br /> November 10, 2003 <br /> Page 2 <br /> c) Upon obtaining a land alteration permit from City staff(issuable for up to 10 cubic <br /> yards of earth movement within the 0-75' setback zone) y-ou will be authorized to <br /> remove approximately 3-5 cubic yards of earth from the midpoint of the ice ridge to <br /> create a level openin� no greater than 10-15' in width. This will allow you to walk <br /> across the wetland as necessary to gain pedestrian access to your property. The earth <br /> removed must be deposited at a location at least 75' from the lake and at least 26' <br /> from any wetland. <br /> d) You will then place lo�s across the new access point to pre�-ent and discourage use <br /> by motor vehicles, since we do not intend to open this right-of-way for general use <br /> unless or until such time that the appropriate wetland impact permits have been <br /> obtained from the MC�VD and the City makes the improvements to the access noted <br /> in item 1 above. <br /> e) Provide `before', `during' and `after' photos of the work y-ou perform to document <br /> the activity for City records. Please advise City staff when the work is complete so <br /> a final inspection can be arranged. <br /> As we discussed on the site on November 6, the above work needs to be accomplished <br /> without any disturbance of the�vetland behind the ice ridge. Therefore,any heavy equipment <br /> to be used must be used in a manner that will not leave any ruts in the wetland nor result in <br /> any filling or excavation of the wetland. You suggested a small tracked vehicle running over <br /> plywood sheets through the «-etland, which would seem acceptable under the current dry <br /> conditions. <br /> I have enclosed the land alteration permit application noted in item c). Please return the application <br /> and obtain the permit, and call for a final inspection once the work is completed. If you have any <br /> questions, please contact me or Public Services Director Greg Gappa at 9�2-249-4600. <br /> Sincerely, <br /> G�j�2``� � <br /> �" <br /> Michael P. Ga fron <br /> Planning Director <br /> encl. <br /> cc: Greg Gappa <br /> Ron Moorse <br /> City Council <br /> Gabriel Jabbour <br />
The URL can be used to link to this page
Your browser does not support the video tag.