My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-1986 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1980-1989
>
1986
>
11-17-1986 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 12:25:01 PM
Creation date
10/20/2022 12:21:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THB PUNNING CONKISSION METING HELD NOVF24BER 17 , 1986 <br />#1088 MCCURDY CONTINUED <br />Applicant stated they needed the existing garage for <br />winter use because they cannot get up or down the <br />driveway during the winter. <br />Bellows stated that the only other feasible alternative <br />would be an over/under type of garage which is very <br />expensive and which she felt. the City could not ask of <br />the applicant, <br />Goetten stated that the existing garage should be <br />acknowledged as a non -conforming use and be allowed to <br />remain. <br />It was moved by Bellows, seconded by Goetten, to <br />recommend approval of the hardcover variance subject to <br />staff recommendation and recognizing the existing garage <br />as a non -conforming structure. Motion, Ayes 5, Nays 0. <br />#1089 Re HUNT GREENE <br />865 PARTENWOOD ROAD <br />VARIAM CE <br />PUBLIC HBI�RING 9:29 - 9:35 <br />The Affidavit of Publication and Certificate of Mailing <br />was noted. <br />Hunt Greene was present for this matter. <br />Assistant Zoning Administrator Gaffron explained the <br />request for a hardcover variance and lakeshore setback <br />variances to construct two separate additions to the <br />existing residence: <br />1) A two-story addition to enlarge the existing <br />kitchen and master_ bedroom, to be located 42' from <br />the shoreline of Stubbs Bay, or extending about 6' <br />closer to the shoreline than the existing house. <br />2) A 101x10' sunroom, I. -story at ground level at the <br />midpoint of the house on the north side - this would <br />be about 60' from the shoreline. <br />Existing hardcover in the 0-75' is 11.0%, proposed <br />hardcover is 11.6%. No proposed hardcover changes in the <br />75-250' area. Gaffron noted that this property was <br />granted a variance in 1983 for a garage addition, which <br />would have increased the 0-75' hardcover to 12.3%, <br />however the garage was never built. Applicant is <br />willing to eliminate the graveled parking area west of <br />the house which would reduce the hardcover up to 800 <br />s.f., resulting in an overall decrease of hardcover in <br />the 0-75' to 9.9%. It was noted that this property has <br />lakeshore on 3 sides of the property. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.