Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />26 July 2022 <br /> <br />Chuck Mayers <br />CenterPoint Energy <br />PO Box 1165 <br />Minneapolis, MN 55440-1165 <br /> <br />RE: Proposed Vacation of Hartzell Addition Drainage and Utility Easements, Orono <br /> 2987 Casco Point Road; 3005 Casco Point Road; and PID 20-117-23-34-0027 <br /> <br />The City of Orono has been requested to vacate the perimeter drainage and utility easements between existing <br />Lot 1 (PID 20-117-23-34-0027) and Lot 2 (2987 Casco Point Road); and the easements between Lot 2 and Lot 3 <br />(3005 Casco Point Road) which terminate at the OHWL. This action is requested in conjunction with a request to <br />combine the three lots into two lots as depicted on the attached site plan. <br /> <br />We are not aware of any utilities located within the existing easements; however, we request your confirmation <br />of this. Enclosed are copies of the proposed site plan, legal descriptions of the easements to be vacated, and the <br />new drainage and utility easements to be dedicated along the new common line between the two newly created <br />lots. Please advise whether you have any objections to vacation of the easements shown. <br /> <br />This item will be on the October 17, 2022 Planning Commission Meeting agenda for a public hearing. Receipt of <br />your comments by or before Monday, October 10th would be appreciated. Please contact me at <br />mcurtis@ci.orono.mn.us or 952.249.4627 for more information of if you have any questions. <br /> <br />Thank you for your input. <br /> <br />Sincerely, <br />CITY OF ORONO <br /> <br />Melanie Curtis <br />Planner <br /> <br />Enclosure <br /> <br />c: via email <br />