My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-2022 Planning Commission Packet
Orono
>
Planning Commission
>
2022
>
09-19-2022 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2022 11:31:05 AM
Creation date
9/21/2022 10:57:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Exhibit E <br /> oNo City of Orono LA22-000045 <br /> Hardcover Calculation Worksheet <br /> (\,, ,__ `�% Property Address: 1153 Elmwood Avenue,Orono,MN 55364 III <br /> !,1'rESHQ�� <br /> Prepared By: Sathre-Bergquist Inc. Date: 7/27/2022 <br /> SB Job Number: 10058-017 Prepared By: JPM <br /> Stormwater Quality Overlay District Tier:(Circle One) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 <br /> Step 1:PROPOSED HARDCOVER <br /> In the following table,identify all items of proposed hardcover on the property,keyed by letter to <br /> Certificate of Survey(survey must accompany this form).Include all existing hardcover items that are <br /> intended to remain,as well as all proposed hardcover items that will be added. Use as many lines as <br /> necessary to accurately depict proposed hardcover status of the property.For Tier 1 properties,identify <br /> any features by letter which are split at the 75'setback line and calculate hardcover square footage <br /> separately for each portion. <br /> Key to Survey Hardcover Item(Describe) Length x Width Total(Square Feet) <br /> (Example) (Garage) (24'x 30') (720 S.F.) <br /> A House 1,393 S.F. <br /> B Proposed Addition 1,095 S.F. <br /> C Existing Deck 210 S.F. <br /> D Pavers 578 S.F. <br /> E Retaining Wall 80 S.F. <br /> F Concrete 54 S.F. <br /> G Driveway Proposed 258 S.F. <br /> H Bituminous Public Road 930 S.F. <br /> I S.F. <br /> J S.F. <br /> K S.F. <br /> • <br /> L S.F. <br /> M S.F. <br /> N S.F. <br /> O S.F. <br /> P S.F. <br /> Q S.F. <br /> R S.F. <br /> S S.F. <br /> T S.F. <br /> U S.F. <br /> ✓ S.F. <br /> W S.F. <br /> X S.F. <br /> Y S.F. <br /> Z S.F. <br /> (1)Total Proposed Hardcover 4598 S.F. <br /> Excludable Hardcover(See City Code Sec 78-1684): <br /> Retaining Wall 80 S.F. <br /> Deck(first 100 ft) 100 S.F. <br /> Bituminous Public Road 930 S.F. <br /> S.F. <br /> S.F. <br /> (2)Total Excludable Hardcover 1110 S.F. <br /> (3)Net Proposed Hardcover[Subtract line(2)from line(1)] 3488 S.F. <br /> (4)Total Lot Area 16292 S.F. <br /> Proposed Hardcover Percentage[(3)+(4)] 21.41% % <br /> III <br /> This is an information packet regarding Hardcover.Every effort has been made to insure the accuracy of the information <br /> con trained herein;however,if any information is not consistent with City Code,the Code provisions will prevail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.