My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-2022 Planning Commission Packet
Orono
>
Planning Commission
>
2022
>
09-19-2022 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2022 11:31:05 AM
Creation date
9/21/2022 10:57:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MCWD, BWSR, and Will Effertz (Kjolhaug) reviewed the boundaries in the field on July 18, 2022. MCWD and <br /> BWSR agreed that the wetland boundary needed to be adjusted to better follow the excavated ditch and <br /> exclude the bermed area (see attached figure). Additionally, one independent flag moved closer to the home • <br /> on site. <br /> MCWD approves the wetland boundaries and types as shown in the delineation report.This decision is valid <br /> for five years.A future project located on this property may require a permit from the MCWD. <br /> I Findings must consider any TEP recommendations. <br /> Attached Project Documents <br /> ❑X Site Location Map E Project Plan(s)/Descriptions/Reports (specify): <br /> Appeals of LGU Decisions <br /> If you wish to appeal this decision,you must provide a written request within 30 calendar days of the date you <br /> received the notice.All appeals must be submitted to the Board of Water and Soil Resources Executive Director <br /> along with a check payable to BWSR for$500 unless the LGU has adopted a local appeal process as identified <br /> below.The check must be sent by mail and the written request to appeal can be submitted by mail or e-mail. <br /> The appeal should include a copy of this notice, name and contact information of appellant(s) and their <br /> representatives (if applicable), a statement clarifying the intent to appeal and supporting information as to why <br /> the decision is in error.Send to: <br /> Appeals& Regulatory Compliance Coordinator <br /> Minnesota Board of Water&Soils Resources <br /> 520 Lafayette Road North <br /> St. Paul, MN 55155 <br /> travis.germundson@state.mn.us <br /> Does the LGU have a local appeal process applicable to this decision? <br /> ❑ Yes' El No <br /> llf yes, all appeals must first be considered via the local appeals process. <br /> Local Appeals Submittal Requirements(LGU must describe how to appeal,submittal requirements,fees,etc.as applicable) <br /> Notice Distribution (include name) <br /> Required on all notices: <br /> • SWCD TEP Member: Stacey Lijewski-stacey.lijewski@co.hennepin.mn.us <br /> ❑x BWSR TEP Member: Jed Chesnut-jed.chesnut@state.mn.us <br /> ❑ LGU TEP Member(if different than LGU contact): <br /> ® DNR Representative: Wes Saunders-Pearce-wes.saunders-pearce@state.mn.us <br /> ❑Watershed District or Watershed Mgmt.Org.: <br /> ® Applicant:sanja.degarmo@gmail.com <br /> ▪ Agent/Consultant:will@kjolhaugenv.com <br /> Optional or As Applicable: <br /> ® Corps of Engineers: usace_requests_mn@usace.army.mil <br /> ❑ BWSR Wetland Mitigation Coordinator(required for bank plan applications only): <br /> ❑ Members of the Public(notice only): ❑ Other: <br /> BWSR NOD Form—November 12, 2019 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.