Laserfiche WebLink
Bolton-Menk.com <br />Recommendations <br />•Mill and overlay with partial reconstruction <br />•Widening where existing conditions allow <br />•Raise low area 4” to 6” <br />•This option provides a longer-term solution to <br />the low unstable area <br />•Reduces risk of road flooding <br />•Provides additional space for pedestrian traffic <br />where practical without wetland impacts