Laserfiche WebLink
Bolton-Menk.com <br />Mill and Overlay <br />•3-inch mill and 3-inch overlay in upland areas <br />•6-inch mill and 3-Inch overlay in wetland areas <br />•Widening to the extent possible given existing <br />conditions <br />•$463,750 <br />•Option extends the life of the pavement and is <br />less expensive than the partial reconstruction <br />option <br />•Option does not provide a long-term solution <br />for the low area or address flooding issues