My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-2022 Council Packet
Orono
>
City Council
>
2022
>
09-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 12:53:06 PM
Creation date
9/19/2022 12:42:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bolton-Menk.com <br />Mill and Overlay <br />•3-inch mill and 3-inch overlay in upland areas <br />•6-inch mill and 3-Inch overlay in wetland areas <br />•Widening to the extent possible given existing <br />conditions <br />•$463,750 <br />•Option extends the life of the pavement and is <br />less expensive than the partial reconstruction <br />option <br />•Option does not provide a long-term solution <br />for the low area or address flooding issues
The URL can be used to link to this page
Your browser does not support the video tag.