Laserfiche WebLink
PROPOSED TIMBER RETAINING WALLS <br />1354 REST POINT CIRCLE <br />MOUND, MINNESOTA <br />GENERAL NOTES <br />1. Soil strength parameters for this project were assumed based on a review of soils viewed by VEC at the project area and information from the client. <br />It is the responsibility of the owner or owner's representative to verify the soil strength parameters provided are representative of the soils available <br />for wall construction. If the soil strength parameters are found to be inconsistent with those used by VEC during the design, this design is no longer <br />valid and it is the responsibility of the owner or owner's representative to notify VEC so the retaining wall system can be redesigned. Failure to <br />notify VEC may result in failure of the retaining wall. <br />2. Design Soil Parameters: <br />a. Retained soil: Imported/on-site clay (CL) phi = 27 degrees gamma = 125 pcf. <br />b. Foundation soil: Imported/on-site clay (CL) phi = 27 degrees gamma = 125 pcf. <br />3. This set of timber retaining wall plans are based on site measurements at the site, as directed by the client. If other plans are produced that contain <br />different information than that referenced, this plan may need to be revised and/or the wall may need to be redesigned. <br />4. This set of timber retaining wall plans are based specifically on the wall being constructed with 6" by 5" timbers and Manta Ray soil anchors. <br />Absolutely no substitutions allowed. <br />5. Location of the timber retaining walls in relation to property lines, utility easements, watershed easements, or any other type of easements are the <br />responsibility of the owner or the site civil engineer. VEC assumes no liability for the location of the retaining wall, or if construction of the proposed <br />retaining wall encroaches any property lines or easements. <br />6. It is imperative that the site surveying of the timber retaining wall be done by the site civil engineer or surveyor and must be based on computer <br />generated site/grading plans and not profile plans done by VEC. Surveying of the retaining wall must take into account the design batter indicated <br />on the enclosed plans and details. Failure to take into account wall batter for timber retaining wall surveying will produce incorrect locations of all <br />top of walls and shall be corrected at no cost to VEC. <br />7. Wall geometry, locations, slopes and surcharge loads for the timber retaining walls were assumed from the information referenced above. If <br />conditions vary greatly in the field from those shown in these plans, VEC must be notified prior to construction of the retaining wall to review the <br />design and/or plans. Modifications to the design and/or plans may be required after the review, and may take up to ten business days to complete. <br />Minor modifications can be made in the field by VEC during construction. <br />8. If there are discrepancies between any information on these plans and information in any project specifications, the more restrictive information <br />takes precedence. Please refer to the Manta Ray installation instructions for additional information. <br />vicLer,q E_ngineering & Consulting, L.L,C <br />i9-441 Village Woods Drive <br />den Prairie, MN 55347 <br />Phone: 952-465-3272 <br />www.vicLeryeng.com <br />© 2022 Vickery E of neerina �onsultin�, ��� <br />PROPOSED TIMBER RETAINING WALLS <br />1354 REST POINT CIRCLE <br />MOUND, MINNESOTA <br />TITLE PAGE AND GENERAL NOTES <br />REV:I DATE: I DESCRIPTION: <br />SHEET INDEX <br />SHEET NO. <br />SHEET DESCRIPTION <br />WI <br />TITLE PAGE & WALL NOTES <br />W2 -W3 <br />WALL ELEVATION VIEWS <br />W4 <br />SECTIONS AND DETAILS <br />SCALE: i w <br />1 SHEET: ' •, I OF: CLIENT: <br />1 BOULDER CREATIONS UNLIMITE <br />VERIFY LINE ABOVE MEASURES I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATIONS, OR <br />NONE I -INCH. IF IT DOESN'T, ADJUST REPORT WAS PR ARE BY ME OR ER MY DIRECT <br />SCALE ACCORDINGLY SUPERVISION AriRAA� <br />%% A DU LICE SED OFESSIONAL <br />ENGINEER DGSSV HE STMINNESOTA. <br />VEC PROJECT NO VEC 21-230 <br />DRAWN BY: VEC <br />REVIEWED BY: RWV <br />DATE: 1 6/4/2022 <br />RONALD CKE � <br />DATE: 6/4/ REG. No.: 24065 <br />