Laserfiche WebLink
, . <br /> Big Island Vets Camp Buildability Analysis <br /> January 27,2005 <br /> Page 5 <br /> Minimum Lot Area: 5.0 acres of diy buildable land minimuin <br /> Minimum Lot Width: 200'minimum,measured as a straight line at the shore]ine and at the 75' <br /> lakeshore setback line <br /> Minimum Structure Setbacks: <br /> Lakeshore (929.4'MSL contour): 75' <br /> Wetlands: 26'(Pending ordina��ce revisions maychange this) <br /> Platted right-of-ways: 30' <br /> Internal side or rear lot line: 50' <br /> Setback from other buildings: 10' <br /> Hardcover Limitations: <br /> 0-75' from OHWL: 0% Allowed <br /> 75-250 from OHWL 25% of 75-250' Zone Allowed <br /> 250-500' from OHWL 30% of 250-500' Zone Allowed <br /> 500-1000' from OHWL 35% of 500-1000' Zone Allowed <br /> Building Height: Maximum 2-1/2 stories; maximum 30' <br /> (Must meet both standards) <br /> Construction Standards (See 78-573): <br /> 1) Foundation Required <br /> 2) Minimum Dwelling Area Required: Seasonal dwelling: 400 sf <br /> Principal Dwelling: 800 sf <br /> 3) Minimum dwelling width: 20' <br /> 4) Minimum roof requirements: (See 78-573) <br /> 5) Minimum Plumbing Requirements: (See 78-573) <br /> 6) Fire Protection System Requirements(See 78-573) <br /> 7) Building Security Requirements: (See 78-573) <br /> On-Site Sewage Treatment System Standards (See 78-574) <br /> Garbage Removal and Sanitation (See 78-575) <br /> Open Burning Prohibited (See 78-576) <br /> Tree Retnoval Regulated (See 78-577 and 78-1285) <br /> Permits are required for private improvements within public rights-of-way(See 78-567) <br />