My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-22 Septic Design
Orono
>
Property Files
>
Street Address
>
P
>
Pinehurst Court
>
625 Pinehurst Court - 06-117-23-33-0011
>
Septic
>
07-11-22 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:08 PM
Creation date
9/6/2022 11:03:42 AM
Metadata
Fields
Template:
x Address Old
House Number
625
Street Name
Pinehurst
Street Type
Court
Address
625 Pinehurst Ct
Document Type
Septic
PIN
0611723330011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- rotect the treatment area <br />- from disturbance, <br />compaction, or other damage <br />by staking, Fencing, etc. <br />Joseph Olson D.B.A. <br />Rusty Olson's--Soil and Percolation Testing <br />Joseph J. Olson--MPCA License #810 <br />11481 Riverview Rd. NE, Hanover, MN 55341 <br />(763) 498-8779 Cell (612) 296-7715 <br />Revised April 5, 2022 <br />Swanson Homes <br />625 Pinehurst Court <br />Orono, Hennepin County <br />This on-site Sewage Treatment System is designed for a Type 1, Four-bedroom home in accordance with <br />the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br />The periodically saturated soils were located at 16-24 inches (mottled soil). Due to the periodically <br />saturated soils, a pressurized mound system with 6 inches of rock will need to be installed to treat the septic <br />effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. This system <br />is designed with 6 inches of rock. <br />The soils at a depth of 12" have a percolation rate averaging 16 MPI. <br />A 2250 -gallon septic tank or its equivalent needs to be installed. All tanks need to be insulated if there is <br />less than two feet of cover over the top of the tanks. Clean outs must be installed on the end of the laterals <br />for maintenance. <br />Use 7/32- inch perforations on the laterals. <br />A 1250 -gallon pumping chamber will need to be installed to lift the effluent to the treatment area. The <br />power supply and Switches must be located outside the manhole and pumping chamber in a weatherproof <br />enclosure. A warning device must be installed with light and sound devices; this is in case of a pump <br />failure. The manifold and supply line must have back drainage to the pumping chamber. <br />Keen all heavy equipment off of the proposed treatment areas before during and after construction. <br />The area around both sites must be fenced off by the contractor before any construction beLyins. <br />With proper installation and maintenance, this system should have no problem in treating septic effluent <br />effectively. Nothing other than gray water, (laundry, showers, etc.) Human water and toilet tissue should be <br />disposed of into the septic tanks. Iron filters and large discharge water treatments stems cannot go <br />into the septic system. Garbage disposals are not recommended. Additives must not be used they may <br />cause harmful damage to your septic system. It is recommended that you pump the septic tanks every two <br />years. <br />Sincerely, <br />Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.