Laserfiche WebLink
DESIGN CRITERIA & LOADING <br />1. CODE: 2018 INTERNATIONAL BUILDING CODE (IBC), AS AMENDED BY THE 2020 MINNESOTA STATE <br />BUILDING CODE (MSBC). <br />2. DESIGN LOADING <br />DEAD LOADS (D) <br />MATERIALS CALCULATED <br />LIVE LOADS (L) <br />OFFICE AREA <br />AND ELECTRICAL DRAWINGS. <br />100 PSF <br />MECHANICAL AREA <br />PRECAST MANUFACTURER SHALL BE RESPONSIBLE FOR THE DESIGN OF ALL EMBEDMENTS <br />300 PSF <br />STAIRS & LANDINGS <br />3 <br />100 PSF <br />GRATING & GRATING PLATFORMS <br />DESIGNED <br />100 PSF <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED <br />BY ME OR UNDER DIRECT SUPERVISION AND THAT AMA DULY LICENSED <br />EQUIPMENT LIFTING HOOKS <br />PROJECT <br />2000 LBS <br />ROOF LIVE LOADS (L/r) <br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. g O LTO N <br />MEN K <br />UNIFORM <br />DRAWN <br />20 PSF <br />EQUIPMENT LIFTING HOOKS <br />SIGNATURE: <br />2000 LBS <br />SNOW LOADS (S) <br />Author <br />481N. <br />Pg GROUND SNOW LOAD <br />2638 SHADOW LANE, SUITE <br />50 PSF <br />Pf FLAT -ROOF SNOW LOAD <br />CHECKED <br />42.4 @ ROOF TRUSSES <br />TYPED OR PRINTED NAME: 200 <br />38.5 @ ALL OTHER LOCATIONS <br />Ce SNOW EXPOSURE FACTOR <br />621N. <br />1.0 <br />IS SNOW LOAD IMPORTANCE FACTOR 1.1 <br />Ct THERMAL FACTOR <br />9 <br />1.1 @ ROOF TRUSSES <br />952)448-8838 <br />104 IN. <br />1.0 @ ALL OTHER LOCATIONS <br />CS SLOPE FACTOR <br />10 <br />1.0 <br />Pd DRIFT SURCHARGE LOAD(S) <br />118 IN. <br />XX PSF <br />w WIDTH OF SNOW DRIFTS <br />11 871N. 113 IN. <br />WIND LOAD (W) <br />V BASIC WIND SPEED 90 MPH (3 SECOND GUST) <br />Vasd ASD WIND SPEED (V*x(0.6)) XX MPH <br />RISK (OCCUPANCY) CATEGORY III <br />EXPOSURE CATEGORY C <br />GCpi INTERNAL PRESSURE COEFFICIENT 0.18 <br />C&C WIND PRESSURE XX PSF <br />EARTHQUAKE (E) <br />RISK (OCCUPANCY) CATEGORY III <br />le SEISMIC IMPORTANCE FACTOR X.XX <br />SS = X.XXg S, = X.XXg <br />SITE CLASS A <br />SDs = X.XXg SD, = X.XXg <br />SEISMIC DESIGN CATEGORY C <br />SEISMIC FORCE RESISTING SYSTEM <br />V DESIGN BASE SHEAR XX KIPS <br />CS SEISMIC RESPONSE COEFFICIENT X.XX <br />R RESPONSE MOD. COEFFICIENT X (OR N/A) <br />ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE <br />FLUID (F) <br />WATER 62.4 PCF <br />SLUDGE 70 PCF <br />LATERAL EARTH PRESSURE LOADS (H) <br />DESIGN WATER TABLE 905.0 FEET <br />100 -YR. FLOOD ELEVATION NA <br />BACKFILL FRICTION ANGLE 30 DEGREES <br />Ko 0.5 <br />Ka 0.33 <br />Kp 3.0 <br />SOIL UNIT WEIGHT, DRY 120 PCF <br />SURFACE SURCHARGE 300 PSF <br />SOIL - AT REST (ABOVE WATER TABLE) 60 PSF/FT. <br />SOIL - AT REST (BELOW WATER TABLE) NA <br />RAIN (R) <br />i RAIN INTENSITY <br />SPECIAL LOADS (IF APPLICABLE) <br />FLOOD DESIGN DATA (IF APPLICABLE) <br />NO I DATE I BY <br />REVISIONS <br />REMARKS <br />XX.X IN/HR <br />NO I DATE I BY <br />REVISIONS <br />REMARKS <br />GENERAL NOTES <br />1. TYPICAL STRUCTURAL DETAILS AND NOTES SHALL APPLY UNLESS NOTED OTHERWISE ON THE <br />DRAWINGS. <br />2. EXAMINE SITE AND DRAWINGS TO DETERMINE LOCATIONS AND DIMENSIONS OF UTILITIES, AND SITE <br />IMPROVEMENTS. <br />3. BEFORE CONSTRUCTION FABRICATION AND ERECTION OF ANY MATERIALS, CONTRACTOR SHALL FIELD <br />VERIFY ALL EXISTING ELEVATIONS, DIMENSIONS AND CONDITIONS AS SHOWN ON THE DRAWINGS AND <br />REPORT DISCREPANCIES TO THE ENGINEER AT ONCE FOR RESOLUTION. <br />4. ALL DIMENSIONS, LOCATIONS, ELEVATIONS AND CONDITIONS OF EXISTING STRUCTURES SHOWN ON <br />THE CONTRACT DRAWINGS SHALL BE FIELD VERIFIED BY THE CONTRACTOR. <br />5. THE STRUCTURAL DESIGN IS BASED ONLY ON THE STRUCTURE IN ITS COMPLETED STATE. <br />CONTRACTORS AND THEIR SUBCONTRACTORS SHALL TAKE WHATEVER PRECAUTIONS ARE <br />NECESSARY TO WITHSTAND ALL HORIZONTAL AND VERTICAL LOADING THAT MAY BE ENCOUNTERED <br />DURING THE CONSTRUCTION PROCESS PRIOR TO THE COMPLETION OF THE STRUCTURE. <br />6. ALL MNDOT REFERENCES IN DRAWINGS & SPECIFICATIONS REFER TO THE "STANDARD <br />SPECIFICATIONS FOR CONSTRUCTION", 2018 EDITION. <br />7. WRITTEN DISTANCES & ELEVATIONS SHALL GOVERN OVER SCALED DISTANCES & ELEVATIONS. <br />8. ELEVATIONS ARE BASED ON THE BENCH MARKS NOTED ON THE DRAWINGS. <br />EXCAVATION NOTES: <br />1. TEMPORARY GROUND CONTROL IS BY CONTRACTOR DESIGN. <br />2. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL TEMPORARY SHEETING AND BRACING NECESSARY <br />TO PROTECT PERSONNEL AND ADJACENT PROPERTY FROM INJURY OR DAMAGE DURING <br />CONSTRUCTION OPERATION. <br />3. EXCAVATIONS OR TRENCHING WITHIN CLOSE PROXIMITY TO UNDERGROUND STRUCTURES, UTILITIES, <br />OR UTILITY POLES WILL REQUIRE PROTECTION AND SUPPORT TO PREVENT DAMAGE OR <br />INTERRUPTION TO SERVICE. THE COST TO PROVIDE THIS PROTECTION SHALL BE INCLUDED IN THE <br />CONTRACTOR'S TOTAL BASE BID PRICE. <br />MASONRY NOTES: <br />1. CONCRETE MASONRY UNITS (CMU) AND FACE BRICK SHALL BE LAID IN RUNNING BOND UNLESS NOTED <br />OTHERWISE. <br />2. PROVIDE OPEN -CORE STYLE CMU FOR ALL MASONRY WALLS. <br />3. PROVIDE BULL NOSED CMU FOR ALL INTERIOR EXPOSED MASONRY WALL CORNERS, DOOR JAMBS AND <br />MASONRY OPENINGS UNLESS NOTED OTHERWISE. <br />4. PROVIDE VERTICAL #5 @ 48" REINFORCEMENT FOR ALL WALLS UNLESS NOTED OTHERWISE. <br />5. GROUT FULL ALL CMU CORES CONTAINING VERTICAL REINFORCEMENT. <br />6. INSTALL HORIZONTAL JOINT REINFORCEMENT BETWEEN EVERY OTHER COURSE OF CMU. <br />7. PROVIDE MASONRY CONTROL JOINTS WHERE INDICATED ON THE DRAWINGS OR AT A SPACING OF NOT <br />GREATER THAN 20 FEET. <br />8. TOOL ALL MASONRY JOINTS CONCAVE. <br />9. PROVIDE 16" DEEP LINTEL AT MASONRY OPENINGS 4'-0" AND LESS. PROVIDE 24" DEEP LINTEL AT ALL <br />OPENINGS GREATER THAN 4'-0". PROVIDE (2) #5 IN ALL LINTELS. <br />10. GROUT SOLID ALL BOND BEAMS AND VERTICAL CORES CONTAINING REINFORCEMENT, EMBEDMENTS AND <br />ANCHORS. <br />11. ALL REINFORCING BARS SHALL BE SPLICED WITH A MINIMUM LAP SPLICE EQUAL TO 48 BAR DIAMETERS. <br />PRECAST CONCRETE PLANK NOTES: <br />1. PRECAST CONCRETE PLANK SHALL HAVE A 1 -HOUR FIRE RATING UNLESS NOTED OTHERWISE. <br />2. VERIFY ALL PLANK PENETRATION SIZES AND LOCATIONS WITH ARCHITECTURAL, MECHANICAL <br />802831 <br />CONCRETE NOTES: <br />1. LAP SPLICES AND 90 DEGREE END HOOKS SHALL BE AS SHOWN BELOW UNLESS NOTED. WHEN BARS OF <br />TWO DIFFERENT SIZES ARE SPLICED, THE LONGER LAP LENGTH SHALL APPLY. <br />2 <br />3 <br />El <br />5 <br />on <br />F'C=4000 PSI <br />AND ELECTRICAL DRAWINGS. <br />BEAM 90 DEGREE <br />3. PRECAST MANUFACTURER SHALL BE RESPONSIBLE FOR THE DESIGN OF ALL EMBEDMENTS <br />BAR LAP <br />BAR <br />REQUIRED FOR THE ATTACHMENT OF ARCHITECTURAL, MECHANICAL AND ELECTRICAL <br />3 <br />COMPONENTS. <br />241N. <br />DESIGNED <br />361N. <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED <br />BY ME OR UNDER DIRECT SUPERVISION AND THAT AMA DULY LICENSED <br />4 <br />PROJECT <br />Designer <br />371N. <br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. g O LTO N <br />MEN K <br />5 <br />DRAWN <br />401N. 461N. <br />SIGNATURE: <br />10 IN. <br />6 <br />Author <br />481N. 561N. <br />2638 SHADOW LANE, SUITE <br />FILE NAME <br />7 <br />CHECKED <br />70 IN. <br />TYPED OR PRINTED NAME: 200 <br />14 IN. <br />8 621N. 80 IN. <br />CHASKA, MINNESOTA 55318 <br />120 IN. <br />Checker <br />9 <br />DATE REG NO 952)448-8838 <br />104 IN. <br />802831 <br />CONCRETE NOTES: <br />1. LAP SPLICES AND 90 DEGREE END HOOKS SHALL BE AS SHOWN BELOW UNLESS NOTED. WHEN BARS OF <br />TWO DIFFERENT SIZES ARE SPLICED, THE LONGER LAP LENGTH SHALL APPLY. <br />2 <br />3 <br />El <br />5 <br />on <br />F'C=4000 PSI SLAB, WALL, COLUMN BEAM 90 DEGREE <br />BAR SIZE BAR LAP TOP <br />BAR <br />BAR LAP <br />BAR <br />HOOK <br />TOP <br />3 19 IN. 241N. 281N. 361N. 6 IN. <br />4 251N. 321N. 371N. 48 IN. 8 IN. <br />5 31 IN. 401N. 461N. 601N. 10 IN. <br />6 371N. 481N. 561N. 721N. 12 IN. <br />7 541N. 70 IN. 81 IN. 105 IN. 14 IN. <br />8 621N. 80 IN. 931N. 120 IN. 16 IN. <br />9 70 IN. 90 IN. 104 IN. 135 IN. 19 IN. <br />10 781N. 102 IN. 118 IN. 153 IN. 221N. <br />11 871N. 113 IN. 131 IN. 170 IN. 24 IN. <br />TOP BAR LAP SPLICES ARE HORIZONTAL REINFORCEMENT PLACED SUCH THAT MORE THAN 12 IN. OF <br />CONCRETE IS CAST IN THE MEMBER BELOW THE SPLICE <br />REINFORCING BARS SHALL HAVE THE FOLLOWING CONC. COVER UNLESS NOTED OTHERWISE. <br />FOOTINGS AND OTHER UNFORMED SURFACES 3" <br />CONCRETE EXPOSED TO EARTH, WEATHER OR FLUIDS <br />6 BARS OR LARGER 2" <br />5 BARS OR SMALLER 1-1/2" <br />CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND <br />BEAMS, COLUMNS, TIES, SPIRALS AND STIRRUPS 1-1/2" <br />SLABS, WALLS & JOISTS 3/4" <br />CONCRETE SHALL BE PLACED WITHOUT CONSTRUCTION JOINTS EXCEPT WHERE SPECIFICALLY SHOWN <br />ON THE DRAWINGS OR AS APPROVED BY THE ENGINEER. <br />ALL CONSTRUCTION JOINTS IN WALLS AND SLABS OF LIQUID CONTAINING STRUCTURES SHALL CONTAIN <br />WATERSTOPS. <br />CAST -IN-PLACE CONCRETE SHALL NOT BE PLACED IN STANDING WATER, ON FROZEN SOIL OR ON <br />FROZEN CONCRETE. <br />FOR LOCATIONS AND DIMENSIONS OF SLEEVES, CURB, OPENINGS AND DEPRESSIONS NOT SHOWN ON <br />THE STRUCTURAL DRAWINGS, SEE ARCHITECTURAL, CIVIL/MECHANICAL, YARDWORK, PLUMBING, HVAC <br />AND ELECTRICAL DRAWINGS. CONTRACTOR SHALL VERIFY AND COORDINATE REQUIREMENTS FOR AND <br />LOCATION OF ABOVE ITEMS WHETHER SHOWN ON THE STRUCTURAL DRAWINGS OR NOT. <br />BEVEL ALL EXPOSED CORNERS OF CONCRETE 3/4" x 3/4". <br />PROVIDE WELDED WIRE FABRIC IN FLAT SHEETS. <br />FOUNDATION AND SOIL NOTES: <br />1. THE GEOTECHNICAL ENGINEER SHALL REVIEW AND APPROVE FOUNDATION BEARING SURFACES <br />PRIOR TO THE PLACEMENT OF FOOTINGS OR FOUNDATION. <br />2. DESIGN ALLOWABLE SOIL BEARING PRESSURE = 3,000 PSF <br />3. PROVIDE A MINIMUM OF 3'-6" OF SOIL COVER AT ALL HEATED STRUCTURE EXTERIOR WALL FOOTINGS. <br />PROVIDE A MINIMUM OF 5-0" OF SOIL COVER AT ALL UNHEATED STRUCTURE FOOTINGS. <br />4. PROTECT FOUNDATION SOILS FROM FREEZING DURING CONSTRUCTION. <br />5. PLACE FILL AND BACKFILL AND COMPACT TO FOLLOWING MAXIMUM STANDARD PROCTOR DENSITIES <br />UNLESS NOTED OTHERWISE IN THE SPECIFICATIONS: <br />LOCATION DENSITY <br />FILL BELOW FOOTINGS 100% <br />FILL BELOW SLABS ON GRADE 98% <br />PIPE AND STRUCTURE EXCAVATIONS 95% <br />GREEN SPACES 90% <br />MCES L46 & L49 IMPROVEMENTS <br />STRUCTURAL NOTES <br />SK0.1 <br />OF