My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2022 Septic Compliance Inspection report
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Dr
>
1125 Pine View Dr - 28-118-23-42-0007
>
Septic
>
07-27-2022 Septic Compliance Inspection report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:18 PM
Creation date
7/28/2022 7:45:02 AM
Metadata
Fields
Template:
Address
House Number
1125
Street Name
Pine View
Street Type
Drive
Address
1125 Pine View Drive
Document Type
Septic
PIN
2811823420007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
https://www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats <br />wq-wwists4-31b • 4/28/2021 Page 3 of 4 <br /> <br />Property Address: 1125 Pineview Dr Orono, MN 55356 <br />Business Name: Ende Septic Service Date: 7/27/2022 <br /> <br />3. Other compliance conditions – Compliance component #3 of 5 <br />3a. Maintenance hole covers appear to be structurally unsound (damaged, cracked, etc.), or unsecured? <br /> Yes* No Unknown <br />3b. Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety? Yes* No Unknown <br />*Yes to 3a or 3b - System is an imminent threat to public health and safety. <br />3c. System is non-protective of ground water for other conditions as determined by inspector? Yes* No <br />3d. System not abandoned in accordance with Minn. R. 7080.2500? Yes* No <br /> *Yes to 3c or 3d - System is failing to protect groundwater. <br /> Describe verification methods and results: <br /> <br /> Attached supporting documentation: Not applicable <br />4. Operating permit and nitrogen BMP* – Compliance component #4 of 5 Not applicable <br />Is the system operated under an Operating Permit? Yes No If “yes”, A below is required <br />Is the system required to employ a Nitrogen BMP specified in the system design? Yes No If “yes”, B below is required <br />BMP = Best Management Practice(s) specified in the system design <br />If the answer to both questions is “no”, this section does not need to be completed. <br />Compliance criteria: <br />a. Have the operating permit requirements been met? Yes No <br />b. Is the required nitrogen BMP in place and properly functioning? Yes No <br /> Any “no” answer indicates noncompliance. <br /> Describe verification methods and results: <br /> <br /> Attached supporting documentation: Operating permit (Attach) <br />
The URL can be used to link to this page
Your browser does not support the video tag.