Laserfiche WebLink
1350 Rest Point Circle, Mound, Minnesota <br /> June 9, 2022 (Rev. June 16, 2022) <br /> Page 15 <br /> • <br /> Required Inspections of Retaining Walls <br /> (for City Building Official) <br /> Project Name/Address: <br /> Permit Number: <br /> Please choose one of the following: <br /> 1. No inspections are required. <br /> 2. The city will perform all needed inspections. <br /> 3. The retaining wall engineer-of-record must complete the following: <br /> Final site visit with wall completion letter. Contractor's Statement of • <br /> Conformance is accepted in lieu of periodic site visits during construction. <br /> Periodic site visits with a wall completion letter that includes documentation of <br /> the engineer's construction observations. <br /> Number of inspections required by building official: <br /> Signature of Building Official or Authorizing Personnel <br /> Printed Name/Phone Number <br /> Date <br /> Independently Owned and Operated 5 <br /> 161 Dunbar Way/Mahtomedi, MN 55115 <br /> 0: 651.779.7700/criterium-schimnowski.com i) <br />