My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
200 Bayside Trail - 06-117-23-22-0027
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:11 PM
Creation date
9/10/2015 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Bayside
Street Type
Trail
Address
200 Bayside Tr
Document Type
Septic
PIN
0611723220027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t . <br /> � � r� <br /> � �1/l � /V � � �f �" a�c��v�D <br /> �� I <br /> �� JAN 2 3 2013 <br /> Joseph Olson D.B.A. <br /> �rTlf 0�ORONO <br /> Rusty Olson's--Soil and Percolation Testin�-�� <br /> Joseph J. Olson--MPCA License #810 <br /> 11481 Riverview Rd. NE, Haoover, MN 55341 <br /> (763) 498-8779 fag (763) 498-8290 <br /> January 15,2013 <br /> Ervin Wachman <br /> PID#0611723220018 <br /> Proposed Lot 2 <br /> Orono,Hennepin.County <br /> This on-site Sewage Treatment System is partially designed for a Type 1,five-bedroom home in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> Once the house size, location and septic primary and future sites are chosen this desigr►can be completed. <br /> The periodically saturated soils were located at 16-18 lnches(mottled soil). Due to the periodically <br /> saturated soils,a pressurized mound system will need to be installed to treat the septic effluent.The bottom <br /> of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of l2"have a percolation rate averaging 6.5 MPI. <br /> The absorption areas do not overlap. <br /> All tanks need to be insulated if there is less than two feet of cover over the top of the tanks.A fi Iter needs <br /> to be installed on the second tank.Clean outs must be installed on the end of the laterals for maintenance. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area.The power supply and <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure.A <br /> warning device must be installed with a light and sound device;this is in case of a pump failure. <br /> Use 7/32 inch perforations on the laterals. <br /> Keep all heavy eyuipment off of t6e proposed treatment areas before and after construction.The <br /> treatment area must be fenced off before construction begins.This Design is not valid &the System <br /> will need to be relocated if failure to protect the areas proposed for the On-Site Sewage Treatment <br /> systems occurs. <br /> Nothing other than gray water,(laundry,showers,ect.)human water&toilet rissue should be disposed of <br /> into the septic tanks. Garbage disposals are not recommended.Additives must not be used;they may cause <br /> harmful damage to your septic system. It is recommended that you pump the septic tank every year for 1 <br /> tank,every two years for two tanks. <br /> sincerely, �"�'�' �F O ONQ <br /> �� 5EPTIC PE IT P _REV <br /> _._----- <br /> �eph J.Olson INSPECT��Rc <br /> DATE '' ' 3 PBRMIT NO.�,,,.,.,�,,,,,,...,�., <br /> APPRQYGA AS St;ii�t(TTEU <br /> APPROYGD WITH CORRF:CTIONS AS nOTBD <br /> NOT AFPROYF:U•CURRF.CT&RF:5L'HMIT � <br /> 'Thcsc eommentc are for your information. All work shall bc du� <br /> _:� <br /> in full compliance with all upplicuble scptic und zoning cuda �l <br /> Reyuiremcnts inctudin�items not sprcificaliy not�J ia Uiis c�wieW. f� ,:,,�,�.� <br /> K f:G!'T H�S P L A K S E T U h S 1 T E A T A L 4 T I�N 4 S .�� �� ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.