My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
200 Bayside Trail - 06-117-23-22-0027
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:11 PM
Creation date
9/10/2015 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Bayside
Street Type
Trail
Address
200 Bayside Tr
Document Type
Septic
PIN
0611723220027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ABSORPTION AREA SIZING <br /> Note:Mound setbocks are measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (1.F)=Absorption Width <br /> 10.0 ft x 2.6 = 26.0 ft <br /> B. For slopes>1%, the Absorption Width is measured downhilt from the upslope edge of the Bed. <br /> Calculate Downslope Abwrption Width:Absorption Width (3.A)-Bed Width (2.6)=ft <br /> 26.0 ft - 10.0 ft = 16.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate C(ean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=C(ean Sand Lift (t ft minimum) <br /> 3.0 ft - 1.3 ft = 1.7 ft Design Sand Lift(optional): �1.7 <br /> B. Cdlculate Ups(ope Height:C(ean Sand�ift (4.A)+media depth (1 ft.)+cover (1 ft.)=Upslope Height <br /> 1.7 ft + 1.0 ft + 1.0 ft= 3.7 ft <br /> U 3::)Inp'r Multi0lier`t able <br /> ; Land Slope'� 0 I 2 3 d 5 6 1 8 9 10 I I 12 13 14 15 16 il 18 19 20 21 �2 23 24 25 <br /> � UpS(Ope l.:l ?.(�':� 2.Si,i.i3�?.75 2.SE 2.5! 25!i:.�+3 1.�i i.?5�2,?I 2.25 2.21 [.'.'"2.13 2.G4 ?.n� 2.0; Ll�' 1.9? I.ii 1.4i I.it 1.Ev I 1.6? 1.9i <br /> i Feim RdiQ 'd:l d.�li 3,&5 's.7i� 3,57 3,a5 3.3i 3.2i 3.1i 3.Oi 2.91�2.65 2.)b 2.10 2.62 2.55 2.�18 ?.�ll 2.?5 2.29 2.2's 2.1$ 2.f3 2.Q8 2.C� t.y8 L9i <br /> LB�d$IOpE''v 0 1 2 3 4 $ 6 7 8 9 ;4� II It� 13 Id! I`, 16 17 i$ l9 '10 tl 22 23 24 "15 i <br /> I ��C�.','I1SIrDP i 3:l :lk� 3.CS�i.'>'i.'s� i.al 3.5? i.55�3.80 J.iS J.1� 1.24 :.,8 :.59 i45':i.21 i.i`� �E8 6.., S.Ei 1.0: 1..{7 1.i's 3.Jt E.4i 9.� i.n.5[i <br /> ', 6?fNRd:'r ;�:i a0('4.!1 d.3s a.5d..lb 5.60 5.2hj5.55 5.fi8 6.25 6.b? l.ta 7.69 E.25 8.92 9.51 t0.t�! 10.45 11.6? 12.�2 !3.19 i3.4i N.Bi 15.6' '6.'.1 Il.�j <br /> Seled Ups(ope Berm Mu(tiplier <br /> �' (based on land slope): 2.71 (figure D-34) <br /> D. Catculate!lpsfope Berm Width:Multip(ier (4.C)X Upslope Mound Height (4.6)=Ups(ope Berm Width <br /> 2.71 ft X 3.7 ft = 10.0 ft <br /> E. Catculate Orop in E(evation Under Bed:Bed Width (2.6) X Land Slope (1.D): 100=Drop (ft) <br /> 10.0 ft X 12.0 % _ �00= 1.20 ft <br /> F. Calculate Downslope Mound Height:Upslope Height (4.B)+Drop in E(evation (4.E)=Downs(ope Height <br /> 3.7 ft + 1.20 ft = 4.9 ft <br /> Select Downstope Berm Mu(tiplier <br /> �' (based on land slope): 5.11 (fi�ure D-34) <br /> H. Calculate Downsfope Berm Width:Mu(tip(ier (4.G)X Downslope Height (4.F)=Downslope Berm Width <br /> 5.11 x 4.9 ft = 25.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption Width (3.6 or 3.C)+4 ft. =ft <br /> 16.0 ft + �4 ft = 20.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 25.0 ft <br /> K. Select Ends(ope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F)=Ends(ope Berm Width <br /> 3.00 ft x 4.9 ft = 15.0 ft <br /> M.Calculate Mound Width: Upslope Berm Width(4.D)+Bed Width (2.6)+Downs(ope Berm Width (4.J)=ft <br /> 10.0 ft + 10.0 tt + 25.0 ft = 45.0 fc <br /> N. Calculate Mound Length:Endslope Berm Width (4.L)+Bed Length (2.C)+Endsiope Berm Width (4.l)=ft <br /> 15.0 ft + 63.0 ft + 15.0 ft = 93.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.