My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
200 Bayside Trail - 06-117-23-22-0027
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:11 PM
Creation date
9/10/2015 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Bayside
Street Type
Trail
Address
200 Bayside Tr
Document Type
Septic
PIN
0611723220027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials Worksheet UNIVERSITY � <br /> Minnesota Pollution OF MINNESOTA �` ,�,�� <br /> Control Agency - <br /> Project ID: ��� O9 Zz <br /> A• Calculate Bed (rock)Votume:Bed Length (2.C)X Bed Width 2.6)X Depth =Vo(ume ft') <br /> 63.0 ft x 10.0 ft X �.0 = 630.0 ft3 <br /> Divide ft'by 27 ft'/yd'to catculate cubic ards: <br /> 630.0 ft' : 27 = 23.3 yd' <br /> Add 20%for constructability: 23.3 yd3 X 1.2 = 28.0 yd' <br /> B. Calculate C(ean Sand Vo(ume: <br /> Volume Under Rock bed:Averaqe Sand Depth x Media Width x Media Length =cubic feet <br /> 2.1 ft x 10.0 fc X 63.0 ft = 1323.0 ft; <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Votume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Totol Clean Sand Volume:Volume from Length+Volume from Width+Vo(ume Under Media <br /> ft' + ft' + ft3 = ft' <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Heiqht - 1)x 3 x Bed Length)T 2=cubic feet <br /> (( 3.5 ft -�) x 3.o ft x 63.0 )T z= 236.3 ft' <br /> Downslope Volume:((Downslope Height-1) x Downslope Absorption Width x Media Length)*2=cubic feet <br /> (( 4.7 ft-�) x 16.0 ft x 63.0 )�-z= 1864.8 ft' <br /> Endslope Volume:(Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.7 ft-1 ) X 3.0 ft X 10.0 ft = 111.0 ft' <br /> Toto[Clean Sand Volume:Upslope Volume +Downslope Volume +Endslope Volume +Volume Under Media <br /> 236.3 ft' + 1864.8 ft' + 111.0 ft3 + 1323.0 ft'= 3535.1 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calcutate cubic yards: 3535.1 ft' = 27 = 130.9 yd' <br /> Add 20%for constructabitity: 130.9 yd3 X 1.2 = 157.1 yd' <br /> C. Calculate Sondy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)+2=cubic feet <br /> � 4.1 _ 0.5 )ft x 45.0 ft X 93.0 )=z= 7533.7 ft' <br /> Tota!Mound Volume-C(ean Sand volume-Rock Volume=cubic feet <br /> 7533J ft3 - 3535.1 ft' - 630.0 ft' = 3368.6 ft' <br /> Divide ft'by 27 ft'/yd'to calcutate cubic yards: 3368.6 ft' = 27 = 124.8 yd; <br /> Add 20%for constructability: 124.8 yd' x 1-2 = 149.7 yd' <br /> D. Calculate Topsoi!Material Vo(ume:Total Mound Width X Total Mound Length X.5 ft <br /> 45.0 ft x 93.0 ft X o.5 ft = 2092.7 ft' <br /> Divide ft3 by 27 ft'/yd3 to calculate cubic yards: 2092.7 ft' : 27 = 77•5 yd' <br /> Add ZO%for constructability_ 77.5 yd' x 1.2 = 93.0 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.