Laserfiche WebLink
reseeded within five (5) days after the completion of the work, weather permitting, or in an area <br /> that is inactive for more than ten (10) days unless authorized and approved by the City Engineer. <br /> Except as otherwise provided in the erosion control plan, seed shall be in accordance with the <br /> City's current seeding specification which may include certified oat seed to provide a temporary <br /> ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc <br /> anchored as necessary for seed retention. The parties recognize that time is of the essence in <br /> controlling erosion. If the Developer does not comply with the erosion control plan and schedule <br /> or supplementary instructions received from the City, the City may take such action as it deems <br /> appropriate to control erosion. The City will endeavor to notify the Developer in advance of any <br /> proposed action, but failure of the City to do so will not affect the Developer's and City's rights or <br /> obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br /> for such work within ten (10) days, the City may draw down the "security" to pay any costs. No <br /> development, utility or street construction will be allowed and no building permits will be issued <br /> unless the Land is in full compliance with the approved erosion control plan. <br /> 15. GRADING PLAN. The Land shall be graded in accordance with the approved <br /> grading development and erosion control plan, Plan "B". The plan shall conform to City of <br /> Orono specifications. Within thirty (30) days after completion of the grading and before the City <br /> approves individual building permits the Developer shall provide the City with an "as <br /> constructed" grading plan certified by a registered land surveyor or engineer that all ponds, <br /> swales, and ditches for public drainage have been constructed on public easements or land owned <br /> by the City. Notwithstanding the foregoing, the City may issue building permits to the Developer, <br /> prior to completion of all grading, provided the City Engineer has determined that adequate <br /> erosion control measures are in place. The "as constructed" plan shall include field verified <br /> 6 <br /> 169371v5 <br />