Laserfiche WebLink
identification signs. The sign shall comply with setbacks and shall be located outside the sight <br /> visibility tria.ngle in compliance with City sign ordinance requirements. <br /> F. All lots have been tested and found capable of providing suitable primary <br /> and alternate sites for on-site sewage treatment systems. For all lots, mound systems will be <br /> required. Special precautions, including but not limited to protective covenants as well as <br /> physical barriers during construction activity, must be taken to protect these sites on both a <br /> short-tertn and long-term basis, as municipal sewers are not projected to be extended to serve <br /> the Land. Before the City signs the Plat, the Developer shall furnish an appropriately executed <br /> Declaration of Restrictive Covenant for Protection of Sewage Treatment Sites, in recordable <br /> form. <br /> G. All of the proposed lots must contain suitable area meeting all established <br /> setback requirements to allow the construction of single family residences. <br /> H. The Developer must obtain a sign permit from the City Building Official <br /> prior to installation of any subdivision identification signs for the Land. The City sign <br /> ordinance allows temporary subdivision identification signs on corner lots provided the signs <br /> meet area, height, and setback requirements, and provided the Developer submits a $1,000.00 <br /> per sign security guaranteeing sign removal when the subdivision is fully developed. <br /> I. Prior to City Council approval of the final Plat, the Developer shall furnish <br /> a boundary survey of the Land with all property corner monumentation of the Land in place and <br /> marked with lath and a flag. Any encroachments on or adjacent to the Land shall be noted on the <br /> survey. The Developer shall post a $500.00 security (the "Monuxnent Security") for the fmal <br /> placement of interior subdivision iron monuments at property corners and the placement of all <br /> monuments pursuant to 1066. The Monument Security was calculated as follows: five (5) lots at <br /> 11 <br /> 169371v5 <br />