My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
185 Bayside Trail - 06-117-23-22-0028
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:14 PM
Creation date
9/10/2015 12:21:56 PM
Metadata
Fields
Template:
x Address Old
House Number
185
Street Name
Bayside
Street Type
Trail
Address
185 Bayside Tr
Document Type
Septic
PIN
0611723220028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3• ABSI�RPTION AREA SIZING <br /> Note:Mound setbacks are measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (t.F)=Absorption Width <br /> 10.0 ft X 2.6 = 26.0 ft <br /> B. For slopes>1%,the Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Calculate Downslope Absorption Width:Absorption Width (3.A)-Bed Width (2.B)=ft <br /> 26.0 ft - 10.0 ft = 16.0 ft <br /> 4• MOUND SIZING <br /> A. Calcutate Clean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=Ctean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.2 ft = 1.8 ft Design Sand Lift (optional): ��1.8 <br /> B. Calculate Upstope Height:Clean Sand Lift (4.A)+medio depth (1 ft.)+cover (1 ft.)=Upslope Height <br /> 1.8 ft + 1.0 ft + 1.0 ft= 3.8 ft <br /> U�14:SlopeMuitipiierTdbl? <br /> Land Slope� (� i 1 3 4 5 6 7 8 9 i0 i I 12 i 3 ta is 16 11 18 I4 1A 2I 22 23 24 15 <br /> UpSIOp? '?:( i.P: 3.91�2,yJ 2.75 %.5E 1.51 2.41 :.� t.d2 2.3b 2il 2.25 _'.Tt �.1? i.�3 2.uY 2.[u 2.U� i.00 �91 1.» I."r3 13t I.@9 1.�7 1.85 <br /> j Bat�iil Fd(`0 ia:i d.�Ci ?.BS i 70 's.57 3.�15 33i 3.23�3.12 3.03 2.94 2.fib 1.I8 2.70 1.62 2.55 2.� 2�d1 2.35 2.24 2.23 2,18 2.ti L�8 2A3 1.98 I.i's <br /> Land Slope� 0 1 � 2 1 4 5 ' 6 7 8 9 IG II It li 14 f5 I6 il iF 19 20 21 It t3 2d 25 <br /> � ['G';tnSlo�.'P ;;:1�3.id: 3.f"t;>.ii i.i0 i.J1�3.53';,66�;.F.O 3.i5 1.11�-419 �.:? =.SS :.55,51J�)-i5 5.E? R.21 �.Ei ?.N ?.A ?.91 E.a'( 3.4i��.a6 I�.i�ti <br /> ! E�9ilit R�1,10 �d:t d.OD�.',l J.3s a.5�t d.16 5.4U 5.26 5.56 5.83 6,25 6.67 1.1-1 7.69 8.25 892 9.57 10.td 10.9�! ll.61 12,d2 13.i9 �L� 14.32 'S.67 �6.5a I7..W <br /> Select Ups(ope Berm Mu(tiplier <br /> �' (based on land slope): 3.33 (figure D-34) <br /> D. Catculate Ups(ope Berm Width:Mu(tiplier (4.C)X Upslope Mound Height (4.6)=Upslope Berm Width <br /> 3.33 ft x 3.8 ft = 13.0 ft <br /> E. Catcutate Drop in Elevation Under Bed:Bed Width (2.6) X Land S(ope (1.D)=100=Drop (ft) <br /> 10.0 ft X 6.0 % : �oo= 0.60 ft <br /> F. Calculate Downs(ope Mound Height:Upslope Height (4.6)+Drop in Elevation (4.E)=Downslope Height <br /> 3.8 fc + 0.60 ft = 4.4 ft <br /> � Select Downslope Berm Mu(tip(ier <br /> (based on land stope): 5.26 (figure D-34) <br /> H. Calculate Downslope Berm Width:Multiplier (4.G)X Downs(ope Height (4.F)=Downslope Berm Width <br /> 5.26 x 4.4 ft = 23.0 fc <br /> I. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption Width (3.6 or 3.C)+4 ft. =ft <br /> 16.0 ft + � ft = 20.0 ft <br /> J. Design Downs(ope Berm =greater of 4H and 41: 23.0 ft <br /> K. Select Endslope Berm Mu(tip(ier: 3.00 (usualty 3.0 or 4.0) <br /> L. Calculate Endsfope Berm (4.K)X Downsfope Mound Heiqht (4.F)=Ends(ope Berm Width <br /> 3.00 ft X 4.4 ft = 13.0 ft <br /> M.Calculate Mound Width: Upslope Berm Width(4.D)+Bed Width (2.6)+Downs(ope Berm Width (4.J)=ft <br /> 13.0 ft + 10.0 fc + 23.0 ft = 46.0 ft <br /> N. Calcutate Mound Length:Endstope Berm Width (4.L)+Bed Lenqth (2.C)+Endslope Berm Width (4.L)=ft <br /> 13.0 ft + 63.0 ft + 13.0 ft = 89.0 tt <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.