My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
185 Bayside Trail - 06-117-23-22-0028
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:14 PM
Creation date
9/10/2015 12:21:56 PM
Metadata
Fields
Template:
x Address Old
House Number
185
Street Name
Bayside
Street Type
Trail
Address
185 Bayside Tr
Document Type
Septic
PIN
0611723220028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY <br /> Minnesota Pollution DesiQ 11 WOf�(Sf1E'Ct �; -- <br /> Control A enc S OF MINNESOTA ,.-,�,,`�� <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated Laterals in rystem/zone: �� - ----_ <br /> (2 feet is minimum and 3 feet is moximum spacing) """`"'"""" L"` \` <br /> �� " -- r - <br /> 2. Select Perforation Spacing: ft "`� " ` ` ��<�,�,.: .- <br /> <...� ..,,�,. <br /> M�n�n�um ' •a--_`__� <br /> 'I:"piytor:�[�ion•.sp.��.rd i'.�f�.�rt t'-Z"of rork t1.. <br /> 3. Select Perforation Diameter Size �n _ _ <br /> (. nf�n�k <br /> 4. Length oj LaterQls =Media Bed Length -2 Feet. �^�+�..����,��_ , � � ���<<��.,���,�;,�:,����,:7 «,:; <br /> � - 2ft = ��ft Perforation can not be doser then 1 foot from edge. <br /> 5• Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spoces = ��ft .- ��ft = �Spaces <br /> 6. Number of Perforations per Latera( is equal to 1.0 ptus the Number of Perforation Spoces (Line 5). <br /> Perforations Per Lateral = �Spaces + 1 = �Perfs. Per Lateral <br /> Check tab(e below to verify the number of perforotions per lateral guarantees less than Q f0%discharge variation. The value is <br /> doub(e if the a center manifo(d is used. <br /> Maximum Number of F'e�o�a:io�s Pe.*later�f to Guarantee<10�Discharge YariaLia� <br /> _Inc�Fe�t�xatic,�s 7,'32 Inc�P?rfe�ratio�s <br /> F��forat�n Spacng fFeet) <br /> f�pe Diaar►�.er�Inct�,i Pe�toration Spacing Pip?D:ameter(Inches) <br /> t 1�: 1tZ 2 3 f.Feeti t 11: 1�� 2 3 <br /> � 90 13 !8 30 6C� 2 11 16 2i 34 68 <br /> �?�- E 12 1b 2� 54 2�� tt� 14 2t� 32 �1 <br /> � R 12 16 25 52 3 9 14 19 30 60 <br /> 3'16 lnch Perforations i;`8 Inch Ferfarahons <br /> Pipe Diam�ter(Inches) Perforation Spacing Pipe Diast:eter�Irachr) <br /> Fe�orat�on S�cmR IFe�t) <br /> f 9t: �X; z ; (Feetl t t�� ti. 2 3 <br /> 2 12 18 25 4b 87 2 21 33 44 74 149 <br /> 2�'� 12 17 24 4fJ EO 2� 20 30 41 69 13` <br /> 3 12 9b 22 31 7� � t� 29 38 64 12� <br /> �• Tota(Number of Perforotions equals the Number of Perforotions per Latera! (Line 6)multiplied by the Number of <br /> Perforated Laternls (Line 1). <br /> �Perf. Per Lateral X �Number of Perf. Laterals = �Totat Number of Perf. <br /> _ __ _ __ <br /> 8. Calculate the Square Feet per Perforation. Recommended volue is 4-10 ft z per perforotion. "�'��"onDtx^���6PM> <br /> PcrtoraHon Diametcr <br /> Does not apply to At-Grodes Me�d,r�, _ <br /> ,,a ,,, , ,, <br /> BedArea = Bed Width (ft)X Bed Length(ft) ,.o• o.is o.�, o.sb o.�4 <br /> 1.5 0.72 0.51 0.69 0.9 <br /> �ft X �� ft = �ft2 :.o° o.zs o.ss o.eo �.oa <br /> 2.5 0.29 0.65 0.89 1./7 <br /> 3.0 D.32 0.72 0.98 i.28 <br /> Square Foot per Perforation =Bed Area divided by the Tota(Number of Perforations (Line 7). •.o o.» o.e3 ,.,s ,..� <br /> 5.0` O.at 0.93 1.26 1.65 <br /> 2 Dwelli�:with 3l76 in[A Io t/i inCh <br /> ft � � perforations - �ftz/perforations t fooc pertora[iom <br /> Dwellimy vrich 1/8 inch peAoratb� <br /> Z�eet Ocher establishment;and;.t5T5 vri[h 3/f6 <br /> 9. Select Minimum Average Head: ft inch to 7/4 inch peAoratiora <br /> 5 ftt[ aher geabtishments and?:5T5 with t/8 i�h <br /> p�no�a��o�s <br /> 10. Select Perforation Discharge (GPM)based on Table III: GPM per Perforation <br /> 11• Determine required Flow Rote by multiplying the Tota!Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.