My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development contract
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Land Use
>
Development contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:16 PM
Creation date
9/10/2015 12:10:54 PM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Land Use
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$100.00 per lot. The Monument Security will be held by the City until the Developer's land <br /> surveyor certifies that all irons have been set following site grading and utility and street <br /> construction. In addition, the certificate of survey must also include a certification that all irons for <br /> a specific lot have either been found or set prior to the issuance of a building permit for that lot. <br /> J. The Developer shall pay to the city engineer the amounts incurred for the <br /> City base map upgrading in escrow. <br /> K. The Developer shall submit the final Plat in electronic format. The <br /> electronic format shall be Auto CAD file. The Developer shall also submit two complete sets of <br /> the Plat on Mylar (one copy for the City's records and one copy for recording with Hennepin <br /> County). The Developer shall also provide one copy reduced to 1"=200'. <br /> 24. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance <br /> with the terms of this Contract, payment of the costs of all Improvements and construction of all <br /> Improvements, the Developer shall furnish the City with a letter of credit, in the form attached <br /> hereto (the "security"), from a bank for 150% of the cost of the Improvements, including any <br /> required landscaping. The amount of the security shall be $358,449.75 The bank shall be subject <br /> to the approval of the City Administrator. The City may draw down the security, upon five (5) <br /> business days' prior written notice to Developer, for any violation of the terms of this Contract. <br /> Amounts drawn shall not exceed the amounts necessary to cure the default. If the Improvements <br /> are not completed at least thirty (30) days prior to the expiration of the security, the City may also <br /> draw it down. If the security is drawn down, the proceeds sha11 be used to cure the default. Upon <br /> receipt of proof sa�isfactory to the City that work has been completed and financial obligations to <br /> the City ha�e been satisfied, with City approval the security may be reduced from time to time by <br /> ninety percent (90%) of the financial obligations that have been satisfied. Ten percent (10%) of <br /> 12 <br /> 169371v5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.