My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design (2)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Septic
>
Septic design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:17 PM
Creation date
9/10/2015 11:35:29 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Septic
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ' 3. ABSORPTION AREA SIZING <br /> Note:Mound setbacks are measured from the Absorption Area. <br /> A. Calculate Abwrption Width:Bed Width (2.6)X Mound Abwrption Ratio (1.F)=Absorption Width <br /> 10.0 ft x 2.6 = 26.0 ft <br /> B. For slopes>1%,the A6sorption Width is measured downhitt from the upslope edge of the Bed. <br /> Catcutate Downs(ope Absorption Width:Absorption Width {3.A)-Bed Width (2.8)=ft <br /> 26.0 ft - 10.0 ft = 16.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate Clean Sond Lift: 3 feet minus Depth to Limiting Conditron (t.C)=tlean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.2 ft = 1.8 ft Design Sand Lift(optional): �� g <br /> B. Catculate Upsiope Height:C(ean Sand Lift (4.A�+media depth (1 ft.)+cover (1 ft.)=Ups(ope Height <br /> 1.8 ft + 1.0 ft + 1.0 ft= 3.8 ft <br /> Q-34:Slope Multiptier Tabte <br /> land Siope� o I 2 3 4 5 6 7 8 9 t0 11 11 13 id t5' )b il 18 19 24 21 12 23 24 25 <br /> Up510� �3:1 i.GC ?.9f 2.8J ??5 2.R6 2.51 2.5�i 2.d8 2.d2 i.35 2,31 2.26 2.21 [.iT i.i3 2.Q4 2.tK Lt13 2.iti t,97 1.9i L93 1.5i 1.89 1.87 1,$5 <br /> B?rn�Ratio �:i d.�6 3.85 9,70 3:57 3.a5 3.33 3.23 3.12 3.03 2,§4 2,8b 2.7fl 2.70 2.b2 2.55 2.J8 2�1 2.35 219 2.13 2.i8 2.fi3 2.08 2.03 1.98 1.93 <br /> Land Siope� G t '2 3 4 5 6 I S 9 10 I1 12 1� Id 15 lb 17 IA 19 30 21 22 13 34 25 <br /> Lb'f�OiIC�P '3:1 3.00 3.1��.19 3.3� 3.dI 3.53 3.6b 3.M 3.95 a.11 a.29 4..{8 d.64 4.95�5.ia 5.55 5.E8 6.Td 6.E3 7.C3 1.a7 7,�i3 8.42 8.93 9.�16 tO.OP <br /> Bef01 Rc1tiG d:t 4.W 4,i7�.35 d.SA 4J6 5.W 5,2b 5,56 5.�5 6.15 6,di 7.td 7.69 8,29 8.92 9.i7 t0.t�1 10.44 11,67 12.4i 13.19-11.99 td.82 15.67 hb�54 11.4; <br /> Select Upslope Berm Multiplier <br /> �" (based on land stope): 2.83 (figure D-34) <br /> D. Catculate Upslope 8erm Width:Muttiplier (4.C)X Upsiope Mound Height (4.B)=Upslope Berm Width <br /> 2.83 ft X 3.8 ft = 10.8 ft <br /> E. Catculate Drap in Elevation Under Bed:Bed Width (2.6) X Land Slope (1.D):100=Drop (ft) <br /> 10.0 ft x 5.0 % = ioo= 0.50 ft <br /> F. Calculate Downs(ope Mound Height:Upslope Height (4.8j+Drop in Etevation (4.E)=Downs(ope Heiqht <br /> 3.8 ft + 0.50 ft = 4.3 ft <br /> Select Downstope Berm Mu(tiplier <br /> �' (based on tand slope): 5.40 (figure D-34) <br /> H.Catculate Dowr�s(ope Berm Width:Mu(tip(ier (4.G)X Downstope Height {4.F)=Downslope Berm Width <br /> 5.00 x 4.3 ft = 21.7 ft <br /> I. Calculate Minimum 8erm to Cover Absorption Area:Uownstope Absorption Width (3.8 or 3.C)+4 ft.=ft <br /> 16.0 ft + C4� ft = 20.0 fc <br /> J. Design Downstope 8erm =greater of 4H and 41: 21.7 ft <br /> K. Select Ends(ope Berm Multiplier: 3.00 (uwaliy 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downsiope Mound Height (4.F)=Endslope Berm Width <br /> 3.00 ft x 4.3 ft = 13.0 ft <br /> M.Calculate Mound Width:Ups(ope Berm Width(4.D)+8ed Width (2.6)+po�slope Berm Width (4.J)=ft <br /> 10.8 ft + 10.0 ft + 21,7 ft = 42.5 ft <br /> N. Calculate Mound Length:Endslope Berm Width (4.L)+g�Length (2.C)+Endslope Berm Width (4.L)=ft <br /> 13.0 ft + 63.0 ft + 13.0 ft = 89.0 tt <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.