My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design (2)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Septic
>
Septic design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:17 PM
Creation date
9/10/2015 11:35:29 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Septic
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ABSORPTION AREA SIZING <br /> Note:Mound seYbocks are meawred from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (1.F)=Absorption Width <br /> 10.0 ft x 2.6 = 26.0 ft <br /> B. For stopes>1%,the Abwrption Width is measured downhilt from the upslope edge of the Bed. <br /> Calculate Downsiope Abwrption Width:Absorption Width {3.A)-Bed Width (2.B)=ft <br /> 26.0 ft - 10.0 ft = 16.0 ft <br /> 4. MOUND SIZING <br /> A. Catculate Ctean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=Ctean Sond Lift (t ft minimum) <br /> 3.0 ft - 1.0 ft = 2.0 ft Design Sand Lift(optional): �2.0 <br /> B. Calcutate Upslope Height:Clean Sand Lift (4.A)+media depth (1 ft.)+cover (1 ft.)=Ups(ope Height <br /> 2.0 ft + 1.0 ft + 1.0 ft= 4.0 ft <br /> D•34:Slope Mul±iptix 7able <br /> Land Slope� 0 I 2 3 4 5 5 7 8 4 10 11 11 13 14 13 18 17 18 I9 20 tt 2t 23 ?a 25 <br /> Upi10��? 3:1 3.� t.91 2.Si i.?5 T.68 2.51 T5s 2.d3 2,a2 i.34 2.31 2.25 2.11 i.i7 i.13 2.G5 2.06 2.0: 2.00 1.5J 1.9i 1.yi t.9i t.84 1.87 1.85 <br /> Berm Ratic a:i �.04 3.85�:3.70 3.57 3.ai 3.33 3.13 3.�2 3_03 2Ad 2.8b 2.78 1,7Q 1�.b2 2,55 2,�E 2:�1 2.39 229� 2.23 2.18 Z.i3 2.08� t�.03 t.98 L�3 <br /> LdRd SIOQ¢°� 0 I 1 3 4 5 6 7 9 9 10 I I {2 13 id f5 lb il 18 19 IO 21 22 23 24 35 <br /> �6llBSIOPP 3:1 3.OQ 3,Q� 3.19 3.30 3.di 3.53 ?.55 3.8G 3.5� 4.i1 d.29 d.d8�.69�.95 i.id 5.55 5.88 6.?d 6.Ei ?.fl: 7.�l1 1,9i @.42 8.93 9.4b ?OA2 <br /> 6Pti�l R�lii�1 d:t 3.4Q 4.t7 d:35 d.5d d.76 i.00 5.2b i.56 5.$S 6.25 b.67 7.1d 7.b9 8.29 8.42 4.51 10,2d 10.44 I1.61 12.42 13.19 13.99 i�t.82 15,b1 ?b.SS 17.� <br /> Select Upslope 8erm Muttiplier <br /> �' (based on tand stope): 3.23 (figure D-34) <br /> D. Calcutate Upslope Berm VYidth:Muitip(ier (4.C)X Upslope Mound Height (4.6)=Upslope Berm�dth <br /> 3.23 n x 4.0 ft = 12.9 tc <br /> E. Calculate Drop in Elevation Under Bed:Bed Width (?.B) X Land 5(ope (1.D):100=Drop (ft) <br /> 10.0 ft X 7.0 % : 100= 0.70 ft <br /> F. Catcutate Downslope Mound Neight:Upslope Height (4.S)+Drop in E(evation (4.E)=Downs(ope Height <br /> 4.0 ft + 0.70 ft = 4.7 tt <br /> Select Downs(ope Berm Mu(tiplier <br /> G' (based on Land slope): 5.32 (figure D-34) <br /> H.Calculate Downstope Berm Width:Muttiplier (4.G)X Downslope Height (4.F)=Downsiope Berm Widtfi <br /> 5.32 x 4.7 n = 25.0 tt <br /> I. Calculate Minimum Berm Lo Cover Absorption Area:Downs(ope Absorption Width (3.B or 3.C)+4 ft.=ft <br /> 16.0 ft + � ft = 20.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 25.0 ft <br /> K. Select Endsiope Berm Multiptier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F)=Ends(ope Berm Width <br /> 3.00 ft x 4.7 ft = 14.1 ft <br /> M.Calcutate Mound Width: Upslope Berm Width(4.D)+Bed Width (2.8)+Downslope Serm Width (4.J)=ft <br /> 12.9 ft + 10.0 ft + 25.0 ft = 47.9 ft <br /> N. Calcutate Mound Length:Ends(ope 8erm Width (4.L)+Bed Length (2.C)+Endslope Berm Width (4.L)=ft <br /> 14.1 tt + 63.0 ft + 14.1 ft = 91.2 fc <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.