My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
100 Bayside Trail - 06-117-23-22-0026
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:07 PM
Creation date
9/9/2015 3:03:41 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Bayside
Street Type
Trail
Address
100 Bayside Tr
Document Type
Septic
PIN
0611723220026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3: ABSORPTION AREA SIZING <br /> Note:Mound setbacks are meosured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.B)X Mound Absorption Ratio (1.F)=Absorption Width <br /> 10.0 ft X 2.0 = 20.0 ft <br /> B. For slopes>1%, the Absorption Width is measured downhill from the upstope edge of the Bed. <br /> Calculate Downslope Absorption Width:Absorption Width (3.A)-Bed Width (2.6)=ft <br /> 20.0 ft - 10.0 ft = 10.0 ft <br /> 4• MOUND SIZING <br /> A. Calculate Cleon Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=C(ean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.7 ft = 1,3 ft Design Sand Lift(optional): ��1.3 <br /> B. Calculate Ups(ope Height:Clean Sand Lift (4.A)+media depth (1 ft.)+cover (1 ft.)=Ups(ope Height <br /> 1.3 ft + 1.0 ft + 1.0 ft= 3.3 ft <br /> [��3d�.iir,ce:!uiSi6lier Iabl� <br /> Land Siope': 0 1 t 3 d 5 ' 6 7 8 9 Ip f I it' I;i Id 15 (b 17 1$ 19 20 21 i2 23 24 25 � <br /> � Up5(4p? I::t 3.p� ?.4ti2.83�i-?` i.�iE i.�112.5=�2.� t.�t: 2.i612.31�?.2��2.21i2.'?�L'3j:A4 2.� Lkli�i.l"�7 I.Yl I.ii l.y's 1.y: j LE4 i.9? I.�i <br /> ' R�rrn Ra;o i�:� a.� 3.d5 3JQ 3,57 i.d5 3.3i :.23 3.12 J.0? 2,va t.ES 1.78 2.70�.b� t.55 L� 2..1 1.35 L29 ?.23 2.i8 2.t3 2.08 2.63 i58 i.93� <br /> LandSiOpe�o Q i ' 2 3 a 5 4 1 8 9 11� il I2 li I� I5 I6 i7 Ifi I9 2� ti 11 t3 24 15 <br /> � ��O��IISIG� i3:1 ?.�: ?.Gi 1.'7�'..i0 :.a1�;.51 i.65�3.EC 3.Si �1.11 .1.29 ;.J3 ..55 :.45�5�'[�!�).i5 5.6? 5.?-! �.6i 7.Qd ?,.I; ?."vy d.a'1 9.9i �.� 10.02 <br /> ; 6�I�fitRd:�r, la:i 3.a; 4.'1 :.;5 :.SS d.76 5.00 5."t6 5.5h 5.68 6,25 6.61 7.IJ 7.b9 8.29 8.92 9.57 Il�.2J 1U.9a 11.h7 12�T t3.19 13.94 1�{.82 l5.61 16.5� i'.J�i <br /> � Select Ups(ope Berm Multiplier <br /> (based on land slope): 2.94 (figure D-34) <br /> D. Calculate Ups(ope Berm Width:Multiplier (4:C)X Upslope Mound Height (4.6)=Ups(ope Berm Width <br /> 2.94 ft x 3.3 ft = 10.0 ft <br /> E. Calculate Drop in Elevation Under Bed:Bed Width (2.6) X Land Slope (1.D):100=Drop (ft) <br /> 10.0 ft X 8.0 % : 100= 0.80 ft <br /> F. Calculate Downslope Mound Height:Upslope Height (4.6)+Drop in E(evation (4.E)=Downslope Height <br /> 3.3 ft + 0.80 ft = 4.1 ft <br /> Select Downslope Berm Multiplier <br /> �' (based on land slope): 4.88 (figure D-34) <br /> H. Calculate Downslope Berm Width:Multiplier (4.G)X Downslope Height (4_F)=Downs[ope Berm Width <br /> 4.88 x 4.1 ft = 20.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption Width (3.B or 3.C)+4 ft. =ft <br /> 10.0 ft + � ft = 14.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 20.0 ft <br /> K. Select Ends(ope Berm Multip/ier: 3.00 (usuatly 3.0 or 4.0) <br /> L. Calculate Ends(ope Berm (4.K)X Downs(ope Mound Height (4.F)=Endstope Berm Width <br /> 3.00 ft x 4.1 ft = 12.0 ft <br /> M.Calculdte Mound Width: Upstope Berm Width(4.D)+Bed Width (2.6)+Downsfope Berm Width (4.J)=ft <br /> 10.0 ft + 10.0 ft + 20.0 ft = 40.0 ft <br /> N. Calculate Mound length:Ends(ope Berm Width (4.L)+Bed Length (2.C)+Endslope Berm Width (4.L)=ft <br /> 12.0 ft + 63.0 ft + 12.0 ft = 87.0 tt <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.