My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
100 Bayside Trail - 06-117-23-22-0026
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:07 PM
Creation date
9/9/2015 3:03:41 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Bayside
Street Type
Trail
Address
100 Bayside Tr
Document Type
Septic
PIN
0611723220026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ABSORPTION AREA SIZING <br /> Note:Mound setbacks are measured from tlie Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.E3)X Mound Absorption Ratio (t.F)=Absorption Width <br /> C10.0 ft X 2.0 = 20.0 ft <br /> B. For slopes>1%,the Absorption Width is me.asured downhilt from the upslope edge of the Bed. <br /> Calculate Downstope Absorption Width:Ab:�orption Width (3.A)-Bed Width (2.B)=ft <br /> C 20.0 ft - 10.0 ft = 10.0 ft <br /> 4• MOUND SIZING <br /> A. Calculate Clean Sand Lift: 3 feet minus Depth to Limitinq Condition (1.C)=Cleon Sand Lift (t ft minimum) <br /> 3.0 ft - 2.3 ft = 1.0 ft Design Sand Lift(optionat): ��1.0 <br /> B. CalCulate Upslope Neight:C(ean Sond Lift (4.A)+media depth (1 ft.)+cover (1 ft.}=Upslope Height <br /> 1.0 ft + 1.0 ft + 1.0 ft= 3.0 ft <br /> D-3.:�Idpe u,uRioiitr Table <br /> j Land Slope�� 4 ; 2 i 4 5 6 7 8 9 t0 l I i1 13� la i5 Ib i7 i8 I9 20 2i 22 13 24 25 <br /> i IJ�}j(n�o j3:i ;.iM: L91,"1$? 2d5 [.5$j2.51�2.1� ?.40 2.�2 i.?4�:.31�2.2b�?.24;t.'7�2.13�2.�4 2U5 i.l7i 2.�' i.y? LSi 1.53 1.9; I.F4 1.�7� LBi <br /> I <br /> I E�fiu kd.;0 �d:i a.ttkkt 3.85 3.70 3,5i 3.a5 3.33�'.13 ?.12 J.U3 2.5d 2.86 ?.7B iJ0 2,62 2.55 L�8 2.41 2.35 2.t9 2.2i 2.IB t.t3 2.08 1.G's 1.48 t.5i i <br /> I Land Slope`�� 7 i 2 3 4 5 h 7 8 9 j i�); i i , i2� i3 ia 15 i6 17 I8 t9 20 2l 22 t3 24 25 's <br /> j ��v;:f151r,Du �1:1 i.G� 3-4ilt.si ;;p 3.1I 's5? i.ES 3.fC 3.35-I.It�.i.29�;.;3 :.!+4 :.y5 5.ia�5.95 5.83 6.?1 E.Si i.i,4 ?.a? ?.Yl 8.�2 F.9i 9..15 ?�.0� <br /> � ��If�'i Rd;i� Id:t d.0(}�1.17i.1.35 4.54 lJ6 5.00 5.26 5.56 S.Bd 6.25 6.61 1.IJ 7.5i 8.'t9 8.92 9.57 10.td 10.5� 1L6? 12.J2 13.I9 13.44 !�1.82 )5.61 16.5; 17.�l.' <br /> Select Ups(ope Berm Mu(tiplier <br /> �' (based on land slope): 2.70 (figure D-34) <br /> D. Catculate Upslope Berm Width:Multip(ier (4.C)X Ups(ope Mound Height (4.6)=Ups(ope Berm Width <br /> 2.70 fc x 3.0 ft = 10.0 tt <br /> E. Calculate Drop in E(evation Under Bed:8ed Width (2.6) X Land Slope (1.D):100=Drop (ft) <br /> 10.0 ft X 12.0 % : 100= 1.20 ft <br /> F. Calculate Downslope Mound Height:Upslope Height (4.6)+Drop in E(evation (4.E)=Downslope Height <br /> 3.0 ft + 1.20 ft = 4.2 ft <br /> � Select Downs(ope Berm Mu(tiplier <br /> (based on land slope): 4.77 (figure D-34) <br /> H. Calculate Downs(ope Serm Width:Multiplier (4.G)X Downs(ope Height (4.F)=Downslope Berm Width <br /> 4.77 x 4.2 ft = 20.0 ft <br /> 1, CaLculate Minimum Berm to Cover Absorption Areo:Downstope Absorption Width (3.6 or 3.C)+4 ft.=ft <br /> 10.0 ft + � 4 � ft = 14.0 ft <br /> J. Design Downs(ope Berm =greater of 4H and 4t: 20.0 ft <br /> K. Select Ends(ope Berm Mu(tiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calcutate Ends(ope Berm (4.K)X Downslope Mound Height (4.F)=Endslope Berm Width <br /> 3.00 ft x 4.2 ft = 13.0 ft <br /> M.talculate Mound Width: Ups(ope Berm Width(4.D)+Bed Width (2.6)+Downslope Berm Width (4.J)=ft <br /> 10.0 ft + 10.0 ft + 20.0 ft = 40.0 ft <br /> N. Calcutate Mound Length:Endslope Berm Width (4.L)+Bed Length (2.C)+Ends(ope Berm Width (4.L)=ft <br /> 13.0 ft + 63.0 ft + 13.0 fc = 89.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.