My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
4565 Bayside Road - 06-117-23-21-0010 - New PID
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:46 PM
Creation date
9/8/2015 11:42:56 AM
Metadata
Fields
Template:
x Address Old
House Number
4565
Street Name
Bayside
Street Type
Road
Address
4565 Bayside Rd
Document Type
Septic
PIN
0611723210010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials Worksheet UNIVERSITY , , �°�>�� <br /> �� <br /> Minnesota Pollution OF MINNESOTA '�,���, <br /> Control Agency - <br /> ProjectlD: v 06.12.13 <br /> A• Calculate 8ed (rock)Volume:Bed Length (2.0 X Bed Width 2.8)X Depth =Volume (ft;) <br /> 22.0 ft X 10.0 ft X 1.0 = 220.0 ftl <br /> Divide ft'by 27 ft'/yd3 to calwlate cubic ards: <br /> 220.0 ft' _. 27 = 8.1 yd' <br /> Add 20%for wnstructability: 8�� yd'X 1.2 = 9•8 yd3 <br /> B. Calculate C1ean Sand Votume: <br /> Volume Under Rock 6ed:Averoge Sarrd Depth x Media Width x Media Length =cubic feet <br /> 1.3 ft X 10A ft X 22A ft = 286.0 (t3 <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-t)X Absorption Width Beyond Bed X Media Bed Length) <br /> � ft -1) X � X �ft - � <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> � f� -1) X � X �f[ _ � <br /> Toto(Cleon Sand Volume: Vofume from Length+Vo(ume from Width+Volume Under Media <br /> � ft� + � ft' + � ft3 = �ft3 <br /> �J <br /> For a Mound on a slope greater than 1% <br /> Upslope Vofume: ((Ups(ope Mound Heiqht - 1)x 3 x Bed Length)+2-cubic feet <br /> (( 3A ft -1) X 3.Oft X 22.0 )+2= 66.0 ft; <br /> Downslope Volume: ((Downslope Height- 1) x Downslope Absorption Width x Media Length)�2=cubic feet <br /> (( 3.6 ft-1) X 14.0 ft X 22.0 )+2= 400.4 ft3 <br /> Ends(ope Volume:(Downs(ope Mound Heiqht-1)x 3 x Media Width =cubic feet <br /> ( 3.6 ft-1 ) X 3.0 ft X 10.0 ft = 78A ft; <br /> Tota(Clean Sand Volume:Upslope Voiume +Downslope Volume +Ends(ope Vo(ume +Volume Under Media <br /> 66.0 ft3 � 400.4 ft� + 78.0 ft' + 286A ft'= 830.4 {t3 <br /> Divide ft3 by 27 ft'/yd'to catculate cubic yards: 830.4 ft3 ; 27 = 30.8 yd' <br /> Add 20%for constructability: 30.8 yd'X 1.2 = 36.9 yd' <br /> C. Calculate Sandy Berm Vo(ume: <br /> Toial Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)=2=cubic feet <br /> ( 3.3 _ 0.5 )ft X 39A ft X 44.0 )�2= 2402.4 ft3 <br /> Total Mound Volume-Clean Sand volume-Rock Volume=cubic feet <br /> 2402.4 ft' _ 830.4 ft' _ 220.0 {t3 = 1352A ft' <br /> Divide ft3 by 27 ft'/yd;to calculate cubic yards: 1352A ft' = 27 = 5p,1 yd3 <br /> Add 20%for constructability: 50.1 yd} x 1.� = 60.1 yd3 <br /> D. Calculate Topsoif Materiaf Volume:Tota!Mound Wid[h X Tota!Mound Leng[h X.S ft <br /> 39.0 ft X 44.0 ft X 0.5 ft = 858.0 ft3 <br /> Divide ft'by 27 ft'/yd'to catculate cubic yards: 858.0 ft; = 27 = 31.g yd3 <br /> Add 20%for constructability: 37.8 yd' x 1.2 = 3g.1 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.