My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
4565 Bayside Road - 06-117-23-21-0010 - New PID
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:46 PM
Creation date
9/8/2015 11:42:56 AM
Metadata
Fields
Template:
x Address Old
House Number
4565
Street Name
Bayside
Street Type
Road
Address
4565 Bayside Rd
Document Type
Septic
PIN
0611723210010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component Length: ��ft Enter the Component Width: �ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> � ft : � ft= �components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> �components X �ft = �ft <br /> E. Number of Rows=Bed Width divided by Component Width (Round up) <br /> � ft : � ft= � rows Adjust width so this is an whole number. <br /> F. Total Number of Components= Number of Components per Row X Number of Rows <br /> � X � _ �components <br /> 6. MOUND SIZING <br /> A. Catculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Ctean Sand Lift <br /> 3.0 ft - 2.0 ft = 1.0 ft Design Sand Lift (optional): �ft <br /> B. Calculate Upslope Height: Clean Sand Lift +media depth + cover(1 ft.) = Upstope Height <br /> 1.0 ft + 1.0 ft + 1.0 ft= 3.0 ft <br /> C. Select Upslope Berm Multiplier(based on land slope): 3.23 <br /> Land Slope:e 0 1 2 3 4 5 6 7 8 9 10 il 12 <br /> Upslope Berm 3:1 3.00 2.91 2.�3 2.75 2.68 2.61 2.5A 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3_12 3.03 2.94 2.86 2.78 Z.70 <br /> D. Calculate Upslope Berm Width: Multiplier X Upslope Mound Height = Upslope Berm Width <br /> 3.Z3 ft X 3.0 ft = 10.0 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope: 100= Drop (ft) <br /> 10.0 ft X 6.0 % : 100= 0.60 ft <br /> F. Calculate Downslope Mound Height: Upstope Height+ Drop in Elevation = Downslope Height <br /> 3.0 ft + 0.60 ft = 3.6 ft <br /> G. Select Downslope Berm Multiplier(based on land slope): 5.26 <br /> Land Slope 9% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Do�vnslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downstope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> 5.26 x 3.6 ft = 19.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 14.0 ft +�ft = 18.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 19.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height =Endslope Serm Width <br /> 3.00 ft X 3.6 ft = 11.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> 10.0 ft + 10.0 ft + 19.0 ft = 39.0 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Len�th + Endslope Berm Width <br /> 11.0 ft + 22.0 ft + 11.0 ft = 44.0 ft <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.