Laserfiche WebLink
5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component Length: �ft Enter the Component Width: ��ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> � ft ' �� ft= �components/row <br /> D. Actual Bed Length =Number of Components/row X Component Length: <br /> ��components X �ft = ��ft <br /> E. Number of Rows = Bed Width divided by Component Width (Round up) <br /> � ft- �� ft= �� �ow5 Adjust width so this is an whole number. <br /> F. Total Num��mponent�_�r of Components per Row X Number of Rows <br /> X ��components <br /> 6. MOUND 51ZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 1.2 ft = 1.8 ft Design Sand Lift (optional): �ft <br /> B. Calculate Upslope Height: Clean Sand Lift + media depth +cover(1 ft.) = Upslope Height <br /> 1•8 ft + 1.0 ft + 1.0 ft= 3.8 ft <br /> C. Select Upslope Berm Multiplier(based on land slope): 2.78 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 �.26 2.21 <br /> Ratifl 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width: Muttiplier X Upslope Mound Height = Upslope Berm Width <br /> 2.78 ft X 3.8 ft = 10.7 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Stope: i00= Drop (ft) <br /> 10.0 ft X 9.0 % : 100= 0.90 ft <br /> F. Calculate Downslope Mound Height: Upslope Height+ Drop in Etevation =Downslope Height <br /> 3.8 ft + 0.90 ft = 4.7 ft <br /> G. Setect Downslope Berm Multiplier(based on land slope): 6.25 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.27 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> 6.25 x 4.7 ft = 29.6 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downstope Absorption Width +4 feet <br /> 16.0 ft +� 4 -�ft = 20.0 ft <br /> �J <br /> J. Design Downslope Berm =greater of 4H and 41: 29.6 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usua(ly 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height =Endslope Berm Width <br /> 3.00 ft X 4.7 ft = 14.2 ft <br /> M. Calculate Mound Width: Upslope Berm Width +ged Width + Downslope Berm Width <br /> 10.7 ft + 10.0 ft + 29.6 ft = 50.2 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 14.2 ft + 63.0 ft + 14.2 ft = 91.4 ft <br />