My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info and design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4555 Bayside Road - 06-117-23-21-0009
>
Septic
>
Septic info and design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:38 PM
Creation date
9/3/2015 2:58:14 PM
Metadata
Fields
Template:
x Address Old
House Number
4555
Street Name
Bayside
Street Type
Road
Address
4555 Bayside Rd
Document Type
Septic
PIN
0611723210009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A, Enter Dispersal Media: <br /> B. Enter the Component Length: ��ft Enter the Component Width: �ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> � ft = �_� ft = ��components/row <br /> D. Actual Bed Length -Number of Components/row X Component Length: <br /> C�components X ��ft = ��ft <br /> E. Number of Rows=Bed Width divided by Component Width (Round up) <br /> � ft ' � ft- �� �OWS Adjust width so this is on who(e number. <br /> F. Total Number of Components= Number of Components per Row X Number of Rows <br /> �� X � - ��components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 1.2 ft = 1.8 ft Design Sand Lift (optional): ��ft <br /> B. Calculate Upslope Height: Clean Sand Lift + media depth +cover(1 ft.) = Upslope Height <br /> 1.8 ft + 1.0 ft + 1.0 ft = 3.8 ft <br /> C. Select Upslope Berm Multiplier(based on land slope): 3.70 <br /> Land Slope°fo 0 1 2 3 4 5 6 7 8 9 10 il 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.6E 2.61 2.54 2.d8 2.42 2.36 2.3i 2.26 2.21 <br /> Ratio 4:1 4.00 3.55 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 Z.78 2.70 <br /> D. Catculate Upslope Berm Width: Multiplier X Upslope Mound Height = Upslope Berm Width <br /> 3.70 ft X 3.8 ft = 14.2 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope= 100= Drop (ft) <br /> 10.0 ft X 3.0 � = 100= 0.30 ft <br /> F. Calculate Downstope Mound Hei ght: U pslo pe Hei ght+ Dr o p i n E l e v a t i o n = D o w n s l o p e H e i g h t <br /> 3.8 ft + 0.30 ft = 4.1 ft <br /> G. Setect Downslope Berm Muttiplier(based on land slope): 4.54 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width:Multiplier X Downslope Height = Downslope Berm Width <br /> 4.54 x 4.1 ft = 18.8 ft <br /> I. Catcutate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 16.0 ft +�-J ft = 20_0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 20.0 ft <br /> K. Select Endstope Berm Multiplier: 3.00 (usual(y 3.0 or 4.0) <br /> L. Catculate Endslope Berm X Downslope Mound Height =Endstope Berm Width <br /> 3.00 ft X 4.1 ft = 12.4 ft <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> 14.2 ft + 10.0 ft + 20.0 ft = 44.2 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 12_4 ft + 63.0 ft + 12.4 ft = 87.8 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.