My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-2022 Council Work Session Packet
Orono
>
City Council
>
2022
>
04-11-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:59:01 PM
Creation date
5/24/2022 1:58:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prepared By: Reviewed By: Approved By: <br /> <br /> <br /> CITY OF ORONO MEMORANDUM <br /> <br />DATE: April 11, 2022 <br />TO: City Council Members <br />FROM: City Engineer <br />RE: 2023 Street Maintenance Project <br /> <br />1. Purpose. The purpose of this action item is to gain council guidance on planning for the 2023 Street <br />Maintenance Project. <br /> <br />2. Background. In order to maintain our city streets the engineering department recommends a portion <br />of the city’s streets for various pavement preservation activities. Streets are inspected and assigned a <br />pavement condition index (PCI) rating. The PCI allows street to street comparisons and provides the data <br />required to conduct street maintenance programming and planning. <br /> <br />3. 2023 Recommended Streets. For 2023 the recommended roads are as follows. <br />Road Pavement <br />Cost Estimate <br />PCI Remarks <br />Fox Street (Brown to <br />Orono Orchard) <br />$ 1,040,200 58 This road was identified for 2023 during last year’s <br />review. Road is permanently load restricted until <br />repaired. A Resident group has submitted a petition <br />requesting the city consider include a trail as part of <br />the project. <br />Townline Road <br /> <br />$ 196,200 51 This road serves residents of Orono, Independence <br />and Medina. Medina and Independence have <br />expressed interest in partnering with 1/3 cost split <br />each in 2023. <br />Total $1,236,400 <br /> <br />4. 2024 and Beyond. The list below is not exhaustive. There are several other roads in need on <br />maintenance in the immediate future (PCI <70). <br />Road Pavement <br />Cost Estimate <br />PCI Remarks <br />Willow Drive (Fox to <br />Brown) <br />$ 575,700 42 <br />Partenwood Road and <br />Lane <br />$ 120,000 52 <br />Orchard Park Road $ 356,900 58 <br />North Arm Drive and <br />Lane <br />$ 722,200 58 Parks CIP has a trail being incorporated into this <br />project when it occurs. <br />Glendale Drive $43,700 58 Connection into Long Lake. ROW in dispute with <br />property owner <br />Old Long Lake Road $ 745,600 60 <br />Ferndale Road West $ 327,700 64 <br />Kelley Avenue $ 506,900 67 This road has suffered from flooding in the past.
The URL can be used to link to this page
Your browser does not support the video tag.