My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-2022 Council Packet
Orono
>
City Council
>
1950-2024
>
2022
>
05-09-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:18:31 PM
Creation date
5/24/2022 1:00:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Prepared By: mcc Reviewed By: J. Barnhart Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. This application is regarding rear and side setback variances in order to construct additions <br />to the existing home. <br /> <br />2. MN§15.99 Application Deadline. The application was received and was considered to be complete <br />on July 21st, 2021. The 60-Day review period has been extended and will now expire on July 16, 2022. <br /> <br />3. Background/ Summary. The Council reviewed this project in October last year and after discussion <br />some Councilmembers expressed their opinion that the proposed expansions and increased <br />encroachments were not supportable. The Council tabled the application at the applicant’s request. <br /> <br />The applicant has provided a revised plan reflecting a <br />proposed 3.5 foot side yard setback, where a 7.5 foot <br />setback is required, in conjunction with rebuilding the <br />detached garage with a 5.9 foot footprint addition to <br />connect it to the home, including a second story. The <br />existing garage is situated 1.2 feet from the lot line <br />and is detached from the home. The revised plans <br />move the entire garage to the south approximately 2.3 <br />feet. They have indicated that they have moved the <br />garage as far south as would be permitted without <br />impacting the existing water supply well. <br /> <br />The goal of the project is to reconfigure the main <br />level to accommodate a half bath, and construct an <br />additional bedroom/office and bathroom over the new <br />garage to improve function and livability. <br /> <br />The revised plan continues to maintain the existing 16 <br />foot setback from the rear lot line where a 30-foot <br />rear, and 7.5-foot side setback are required. <br /> <br />4. Planning Commission Vote and Comment. On <br />September 20th, the Planning Commission held a public hearing. Following the public hearing the <br />Planning Commission voted 7 to 0 on a motion to approve the original variances. <br /> <br />5. Public Comment. No new comments from the neighbors have been received. The neighbor <br />acknowledgments from their original proposal are attached as Exhibit C. <br /> <br />6. Staff Recommendation. Staff recommends approval of the revised plan which offers a greater <br />setback for building maintenance and stormwater distribution. The applicant should address the <br />stormwater, with the building permit submittal, so that the property to the north is not adversely impacted. <br /> <br />Item No.: 11 Date: May 9, 2022 <br />Item Description: LA21-000051 – Robert Linden Construction, 1074 Loma Linda <br />Avenue, Variances <br />Presenter: Melanie Curtis <br />Planner <br />Agenda <br />Section: <br />Planning Department <br />Report
The URL can be used to link to this page
Your browser does not support the video tag.