My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-2022 Council Packet
Orono
>
City Council
>
1950-2024
>
2022
>
05-09-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:18:31 PM
Creation date
5/24/2022 1:00:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Prepared By: Reviewed By: Approved By: <br />1.Purpose. The purpose of this action item is to reject bids for the new public works facilitypProject <br />and provide direction on a way forward. <br />2.Background. In May of 2021 the city began a design process for a new public works facility at 365 <br />Old Crystal Bay Road. Design work was completed in April and the project put out for Bid with bid date <br />of April 26th 2022. <br />3.Scope of Work. The project consists of the construction of a new public works facility with <br />associated site work. <br />4.Cost. The city received seven bids. The bid Summary is at Exhibit A. The low bid for was for <br />$18,382,000 from Rochon Cooperation. The low bid is significantly higher than the project estimate and <br />funding. A bid analysis is included as part of Exhibit B. <br />5.Funding. The project is funded by a facility bond. A facility bond was sold in December of 2021 <br />with $13,000,000 allocated for the PW facility. <br />6.Design Committee Recommendation. The design committee met on May 2nd to analysis the bids <br />and develop a recommendation for a way forward. The committee recommends rejecting all bids and <br />repackaging the project in to component parts (Site work, Facility, Commodity Yard) for rebid in the <br />future. Timing of the rebid should be based on monitoring construction costs but with bid packets ready <br />by August 2022. <br />7.Staff Recommendation. I council reject the bids as the costs exceed funding available. The project <br />is not time sensitive so delaying to wait for market condition to improve makes sense. <br />COUNCIL ACTION REQUESTED <br />Move to reject the bids received for the public works facility and to direct staff and consultants to prepare <br />bid packages for rebid. <br />Exhibits <br />A.Bid Tab <br />B.Oertel Architects Bid Review Letter. <br />References <br />A.Orono PW Bid Package <br />Item No.: 10 Date: May 9, 2022 <br />Item Description: Public Works Facility (21-039)- Bids <br />Presenter: Adam T. Edwards, P.E. <br />City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.