My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-2022 Council Packet
Orono
>
City Council
>
2022
>
05-23-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:00:16 PM
Creation date
5/24/2022 12:57:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8 <br /> <br />220299v4A <br />23. PARK DEDICATION FEE. The Land is subject to the standard Park Dedication Fee <br />requirement for the City of Orono. The fair market value of the property determined by the County Assessor is <br />$915,000, the average per acre value is $37,074; therefore, the Park Dedication Fee is calculated as follows: <br />0.1 acre per lot x 2 lots = 0.2 x $37,074.55 per acre = $7,415.00 <br />24. LANDSCAPING/ SEPTIC PROTECTION. All landscaping shall be installed in accordance <br />with the approved landscape and restoration plan prior to release of any security. The construction limits shall be <br />clearly marked with adequate fencing and signage around trees and septic systems to prevent any construction <br />damage or disturbance of any trees and vegetation outside of the construction area. <br /> 25. SPECIAL PROVISIONS. The following special provisions shall apply to development of the <br />Land: <br /> A. Implementation of and adherence to the findings and conditions listed in Resolution 7188 <br />Approving a Preliminary Plat for Long Bridge (File No. LA21-000021) dated March 12, 2021 and in Resolution <br />______ Approving a Final Plat for Long Bridge (File No. LA 22-000003) dated ________. <br />B. Implementation of and adherence to the City Engineer’s comments, conditions, and <br />recommendations dated March 1, 2021. <br /> C. Final Plat approval is subject to Minnehaha Creek Watershed District (“MCWD”) approval <br />and permits as required. The City will not release the Plat for recording until the MCWD has approved the <br />stormwater management plans and the Developer has provided evidence that all required MCWD permits have <br />been obtained. <br />D. Implementation of and adherence to the MCWD comments and recommendations dated <br />March 8, 2021. <br />E. Final Plat approval is subject to suitable documentation for two septic sites for Lots 1 and <br />3. The septic sites must be clearly marked with adequate fencing to prevent damage or disturbance to the sites.
The URL can be used to link to this page
Your browser does not support the video tag.