My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-2022 Planning Commission Packet
Orono
>
Planning Commission
>
2022
>
04-18-2022 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2022 8:55:35 AM
Creation date
4/19/2022 8:15:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• General Comments. <br /> Parking. City Code requires 2 parking spaces per dwelling unit. One of these spaces should be covered. <br /> Building Height. Note than no building may be taller than 30 feet in defined height. Most of the submitted examples <br /> suggest two story buildings,which should be fine,but one example appeared to include a useable third story. <br /> Water. The developer will be required to construct the infrastructure necessary to get water from its current terminus <br /> to the development. There is a water main stub on the north side of Wayzata Blvd for that purpose. The water <br /> main will run along the north side of Wayzata Blvd in order to not conflict with sanitary on the south side. The <br /> city would review the design and then take over maintenance of the asset once complete. <br /> Sewer. The developer would be required to construct the infrastructure necessary to connect the development to <br /> existing sanitary infrastructure. You should begin design conversation with the city engineer early, a lift station <br /> may be required,located in a spot capable of supporting both the Eisinger development and any potential <br /> Development on the Dumas Property. The lift station would then either connect directly to the MCES forcemain <br /> that runs on the south side of Wayzata Blvd(if allowed by MCES)or would comment via forcemain to the <br /> Existing Manhole near the intersection with Old Crystal Bay road. Developer would bear the cost of the design <br /> and installation lift station and sewer mains.The City would review the design and then take over maintenance of <br /> the asset once complete. We can support an appropriate credit to the sewer connection fees,to be approved by <br /> the City Council. <br /> Fire. The Fire Chief will need to approve the location of all fire hydrants once utility plans are developed. <br /> • All residential units will be fire sprinldered,per fire code. <br /> The Fire Chief recommends that a second access to shown,off of Wayzata Blvd. <br /> Outside agency review. <br /> It is recommended that you contact the watershed district early in the design process to better understand their rules <br /> and regulations.Also,they would be the agency to approve any buffer averaging. Any formal approval will require <br /> their permit. <br /> There is an old landfill in the southern half of the property. Any formal approval will require MPCA approval/ <br /> permits. <br /> Access onto Wayzata Blvd will require a Hennepin County Permit. I have sent a copy of the plan to them for their <br /> comment. <br /> Please feel free to contact me at 952.249.4626 or by email at jbarnhart@ci.orono.mn.us if you have any questions <br /> on the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> qt rItc,4 • <br /> Jeremy Barnhart,AICP <br /> • Community Development Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.